Skip to main content
An official website of the United States government
The .gov means it's official.
Federal government websites often end in .gov or .mil. Before sharing sensitive information, make sure you're on a federal government site.
The site is secure.
The https:// ensures that you are connecting to the official website and that any information you provide is encrypted and transmitted securely.
Search:
Agenda
Reg Review
ICR
Information Collection List
IC Title
Status
Responses
Hours
Dollars
Document Type
Form No.
Form Name
250.710(a) - Safety Meetings
Unchanged
7512
5634
0
250.710(b); 738(p) - Well-Control Drill Plan
Unchanged
308
154
0
250.711(b), (c) - Daily Drill Report
Unchanged
8320
8320
0
250.712(a), (b), (f) - Notify BSEE of Rig Movements
Unchanged
20
2
0
250.712(a), (b), (f) - Rig Movement Notification Report
Unchanged
151
30
0
Other-eWell Screen Shot
Form and Instruction
BSEE-0144
Rig Movement Notification Report
Other-PRA Statement for eWell
250.712(a), (b), (f) - Updated Rig Movement Form
Unchanged
832
166
0
250.712(c), (e) - Warm or Cold Stacked
Unchanged
50
25
0
250.712(d) - Construction Repairs/Mods to MODU/Rig
Unchanged
10
20
0
250.713(a), (b) - Fitness Requirements
Unchanged
30
150
0
250.713(a), (b) - Foundation Requirements
Unchanged
466
2330
0
250.714 - Dropped Objects Plan
Unchanged
40
1600
0
250.715 - GPS for MODUs - Install
Unchanged
20
0
6500
250.715 - GPS for MODUs - Monthly tracking fee
Unchanged
40
0
24000
250.715 - GPS for MODUs - Rent GPS
Unchanged
40
0
72000
250.715 - GPS for MODUs - tracking/locator data
Unchanged
1
1
0
250.720(a) - Interrupting Operations
Unchanged
150
750
0
250.720(a)(3) - Resuming Operations
Unchanged
25
13
0
250.720(d) - Intervention Operations
Unchanged
20
10
0
250.721(d), (f), (g) - plans to re-cement, repair, etc.
Unchanged
88
44
0
250.721(g)(5) - Test Results
Unchanged
1340
1005
0
250.721(g)(6) - failed negative pressure test
Unchanged
14
14
0
250.722 - Evaluation results report
Unchanged
247
741
0
250.722 - Successful pressure test
Unchanged
300
150
0
250.722(b)(3) - Pressure test after repairs
Unchanged
300
300
0
250.723(d) - Request exceptions prior to moving rig
Unchanged
845
1268
0
250.724 - Transmit RTM data onshore
Unchanged
30
64800
0
250.724(c) - Develop and implement a RTM plan
Unchanged
130
650
0
250.730(a)(4) - Schematic drawings
Unchanged
10
240
0
250.730(c)(1) - Written notice of equipment failure
Unchanged
30
60
0
250.730(c)(2) - Analysis report re equipment failure
Unchanged
30
150
0
250.730(c)(2) - Extension Request
Unchanged
5
5
0
250.730(c)(3) - Submit report re design change/modified procedures
Unchanged
2
10
0
250.730(d)(1) - Alternate approval from using to API Spec. Q1
Unchanged
1
5
0
250.732(a) - Submit ITP verification
Unchanged
150
1500
765000
250.732(c) - Verification that an ITP conducted detailed reviews
Unchanged
10
100
0
250.732(d) - Documentation that demonstrates compliance
Unchanged
160
40
0
250.734(a)(7) - Acoustic control system
Unchanged
1
5
0
250.734(a)(7) - Additional information / acoustic control system
Unchanged
10
10
0
250.734(a)(9); 738(n) - Labeling
Unchanged
33
50
0
250.737(a)(4) (d)(10) - 21-day BOP testing frequency
Unchanged
25
75
0
250.737(a)(4) (d)(10) - Quarterly reports
Unchanged
100
100
0
250.737(c); 746(a), (b), (c), (d) - Record time, date, and results
Unchanged
4457
34542
0
250.737(d)(12) - Document all autoshear, EDS, and deadman test results
Unchanged
2520
1260
0
250.737(d)(12) - Make available upon request.
Unchanged
120
120
0
250.737(d)(2), (d)(3), (d)(4) - Notify DM 72 hours prior to testing
Unchanged
186
47
0
250.737(d)(2), (d)(3), (d)(4) - Results w/in 72 hours after completion
Unchanged
1239
6815
0
250.737(d)(5) - Alternating testing schedule
Unchanged
50
25
0
250.737(e) - 72 hour advance notice of location of shearing ram tests
Unchanged
136
34
0
250.738(f) - BOP configuration changes
Unchanged
15
8
0
250.738(g) - Demonstrate well-control procedures
Unchanged
15
15
0
250.738(i) - ITP report - fit for service
Unchanged
50
25
0
250.738(k) - Latching up BOP stack/re-establishing power
Unchanged
2
2
0
250.738(m) - ITP report re-equipment design and suitability
Unchanged
10
20
0
250.738(o) - ITP report re failure of redundant control
Unchanged
15
15
0
250.738; 746(e) - DM Approval
Unchanged
25
13
0
250.738; 746(e) - DM Approval - 2 barriers in place prior to BOP removal
Unchanged
1
1
0
250.738; 746(e) - DM Approval - Prior to resuming operations for new/repaired/reconfigured BOP
Unchanged
200
50
0
250.738; 746(e) - DM Approval - Put well in safe condition
Unchanged
25
25
0
250.738; 746(e) - DM Approval - Well control demands above rating pressure
Unchanged
15
15
0
250.738; 746(e) - DM Approval - problems, issues, leaks
Unchanged
25
25
0
250.739 - meet/exceed API Standard 53
Unchanged
350
3413
0
250.739(b) - ITP report documenting inspection
Unchanged
21
105
0
250.740; 711(b); 724(b); 738(c); 745; 746 - Daily report/records
Unchanged
312
130
0
250.740; 711(b); 724(b); 738(c); 745; 746 - Required Info.
Unchanged
25
25
0
250.740; 741; 724(b) - Drilling records
Unchanged
3460
7439
0
250.740; 741; 724(b) - Retain data for 2 years after completion
Unchanged
120
60
0
250.742 - Core analyses
Unchanged
150
150
0
250.742 - Directional and vertical-well surveys
Unchanged
281
281
0
250.742 - Velocity profiles and surveys
Unchanged
55
55
0
250.742 - Well logging operations
Unchanged
281
843
0
250.745 - Varies records of operations
Unchanged
308
462
0
250.746 - Casing and liner presser tests
Unchanged
4160
8320
0
250.746(f) - Retain pressure tests, actuations, and inspections in daily report
Unchanged
1563
2345
0
250.751 - BOP and coiled tubing tests
Unchanged
1320
3630
0
Application for Permit to Modify (APM/revised APM) - 250.460;465;518(f);619(f);701-738;1704(g)
Removed
0
0
0
Form and Instruction
BSEE-0124
Application for Permit to Modify (APM)
Other-eWell Screenshots
Other-PRA Statement for eWell
Applications for Permit to Drill (APD/revised APD) - 250.410-418;420(a)(7);423(c)(1);428(b),(k);701-738
Removed
0
0
0
Form and Instruction
BSEE-0123
Application for Permit to Drill (APD)
Other-eWell Screenshots
Form and Instruction
BSEE-0123S
Supplemental APD Information Sheet
Other-eWell Screenshots
Other-PRA Statement for eWell
Subpart B - 250.287; 291; 292
Removed
0
0
0
Subpart D - 250.420(b);421(b);423(c);428(c),(d),(k);462(c),(d),(e);465(a),(b);721(g);743(a),(b),(c);744;746(e);1704(h)
Removed
0
0
0
Form
BSEE-0125
End of Operations Report
Other-eWell Screen Shots
Form
BSEE-0133
Well Activity Report (WAR)
Other-eWell Screenshots
Form
BSEE-0133S
Open Hole Data Report (Supplement to the WAR)
Other-eWell Screenshots
Other-PRA Statement for eWell
Subpart G - BOP System Requirements - 250.730-739;746a,b,c,d,e
Removed
0
0
0
Subpart G - Records and Reporting Requirements - 250.711(b);738(c);740-746
Removed
0
0
0
Subpart G - Rig Requirements - 250.710 - 715; 738(p)
Removed
0
0
0
Other-Screen Shots
Form and Instruction
BSEE-0144
Rig Movement Notification Report
Other-PRA Statement for eWell
Subpart G - Well Operations - 250.720 - 724; 744(a)
Removed
0
0
0
Total burden requested under this ICR:
43408
160842
867500
To view an IC, click on IC Title