Information Collection List

IC Title Status Responses Hours Dollars Document Type Form No. Form Name
250.710(a) - Safety Meetings Modified 18000 13500 0
250.710(b); 738(p) - Well-Control Drill Plan Modified 1528 764 0
250.711(b), (c) - Daily Drill Report Modified 2571 2571 0
250.712(a), (b), (f) - Notify BSEE of Rig Movements Modified 50 13 0
250.712(a), (b), (f) - Rig Movement Notification Report Modified 170 43 0 Other-eWell Screenshots
Form and Instruction BSEE-0144 RIG MOVEMENT NOTIFICATION REPORT
Other-PRA Statement for eWell
250.712(a), (b), (f) - Updated Rig Movement Form Modified 1700 425 0
250.712(c), (e) - Warm or Cold Stacked Modified 50 25 0
250.712(d) - Construction Repairs/Mods to MODU/Rig Modified 10 20 0
250.713(a), (b) - Fitness Requirements Modified 30 150 0
250.713(a), (b) - Foundation Requirements Modified 900 4500 0
250.714 - Dropped Objects Plan Modified 40 1600 0
250.715 - GPS for MODUs - Install Modified 20 0 6500
250.715 - GPS for MODUs - Monthly tracking fee Modified 40 0 24000
250.715 - GPS for MODUs - Rent GPS Modified 40 0 72000
250.715 - GPS for MODUs - tracking/locator data Modified 5 5 0
250.720(a) - Interrupting Operations Modified 150 750 0
250.720(a)(3) - Resuming Operations Modified 35 18 0
250.720(d) - Intervention Operations Modified 20 10 0
250.721(d), (f), (g) - plans to re-cement, repair, etc. Modified 10 5 0
250.721(g)(5) - Test Results Modified 150 113 0
250.721(g)(6) - failed negative pressure test Modified 10 10 0
250.722 - Evaluation results report Modified 30 90 0
250.722 - Successful pressure test Modified 25 13 0
250.722(b)(3) - Pressure test after repairs Modified 5 5 0
250.723(d) - Request exceptions prior to moving rig Modified 20 30 0
250.724 - Transmit RTM data onshore Modified 30 64800 0
250.724(c) - Develop and implement a RTM plan Modified 20 100 0
250.730(a)(4) - Schematic drawings Modified 15 360 0
250.730(c)(1) - Written notice of equipment failure Modified 40 80 0
250.730(c)(2) - Analysis report re equipment failure Modified 40 200 0
250.730(c)(2) - Extension Request Modified 10 10 0
250.730(c)(3) - Submit report re design change/modified procedures Modified 2 10 0
250.730(d)(1) - Alternate approval from using to API Spec. Q1 Modified 1 5 0
250.732(a) - Submit ITP verification Modified 1300 13000 6630000
250.732(c) - Verification that an ITP conducted detailed reviews Modified 10 100 0
250.732(d) - Documentation that demonstrates compliance Modified 10 3 0
250.734(a)(7) - Acoustic control system Modified 1 5 0
250.734(a)(7) - Additional information / acoustic control system Modified 100 100 0
250.734(a)(9); 738(n) - Labeling Modified 60 90 0
250.737(a)(4) (d)(10) - 21-day BOP testing frequency Modified 12 36 0
250.737(a)(4) (d)(10) - Quarterly reports Modified 48 48 0
250.737(c); 746(a), (b), (c), (d) - Record time, date, and results Modified 13300 103075 0
250.737(d)(12) - Document all autoshear, EDS, and deadman test results Modified 140 70 0
250.737(d)(12) - Make available upon request. Modified 10 10 0
250.737(d)(2), (d)(3), (d)(4) - Notify DM 72 hours prior to testing Modified 430 108 0
250.737(d)(2), (d)(3), (d)(4) - Results w/in 72 hours after completion Modified 1 6 0
250.737(d)(5) - Alternating testing schedule Modified 50 25 0
250.737(e) - 72 hour advance notice of location of shearing ram tests Modified 15 4 0
250.738(f) - BOP configuration changes Modified 5 3 0
250.738(g) - Demonstrate well-control procedures Modified 15 15 0
250.738(i) - ITP report - fit for service Modified 5 3 0
250.738(k) - Latching up BOP stack/re-establishing power Modified 2 2 0
250.738(m) - ITP report re-equipment design and suitability Modified 40 80 0
250.738(o) - ITP report re failure of redundant control Modified 15 15 0
250.738; 746(e) - DM Approval Modified 10 5 0
250.738; 746(e) - DM Approval - 2 barriers in place prior to BOP removal Modified 5 5 0
250.738; 746(e) - DM Approval - Prior to resuming operations for new/repaired/reconfigured BOP Modified 50 13 0
250.738; 746(e) - DM Approval - Put well in safe condition Modified 25 25 0
250.738; 746(e) - DM Approval - Well control demands above rating pressure Modified 15 15 0
250.738; 746(e) - DM Approval - problems, issues, leaks Modified 25 25 0
250.739 - meet/exceed API Standard 53 Modified 350 3413 0
250.739(b) - ITP report documenting inspection Modified 40 200 0
250.740; 711(b); 724(b); 738(c); 745; 746 - Daily report/records Modified 18000 9000 0
250.740; 711(b); 724(b); 738(c); 745; 746 - Required Info. Modified 25 25 0
250.740; 741; 724(b) - Drilling records Modified 40 86 0
250.740; 741; 724(b) - Retain data for 2 years after completion Modified 18000 9000 0
250.742 - Core analyses Modified 18000 18000 0
250.742 - Directional and vertical-well surveys Modified 18000 18000 0
250.742 - Velocity profiles and surveys Modified 40 40 0
250.742 - Well logging operations Modified 40 120 0
250.745 - Varies records of operations Modified 40 60 0
250.746 - Casing and liner presser tests Modified 18000 36000 0
250.746(f) - Retain pressure tests, actuations, and inspections in daily report Modified 40 60 0
250.751 - BOP and coiled tubing tests Modified 18000 49500 0
Total burden requested under this ICR: 150081 350615 6732500  
To view an IC, click on IC Title