Skip to main content
An official website of the United States government
The .gov means it's official.
Federal government websites often end in .gov or .mil. Before sharing sensitive information, make sure you're on a federal government site.
The site is secure.
The https:// ensures that you are connecting to the official website and that any information you provide is encrypted and transmitted securely.
Search:
Agenda
Reg Review
ICR
Information Collection List
IC Title
Status
Responses
Hours
Dollars
Document Type
Form No.
Form Name
250.710(a) - Safety Meetings
Modified
18000
13500
0
250.710(b); 738(p) - Well-Control Drill Plan
Modified
1528
764
0
250.711(b), (c) - Daily Drill Report
Modified
2571
2571
0
250.712(a), (b), (f) - Notify BSEE of Rig Movements
Modified
50
13
0
250.712(a), (b), (f) - Rig Movement Notification Report
Modified
170
43
0
Other-eWell Screenshots
Form and Instruction
BSEE-0144
RIG MOVEMENT NOTIFICATION REPORT
Other-PRA Statement for eWell
250.712(a), (b), (f) - Updated Rig Movement Form
Modified
1700
425
0
250.712(c), (e) - Warm or Cold Stacked
Modified
50
25
0
250.712(d) - Construction Repairs/Mods to MODU/Rig
Modified
10
20
0
250.713(a), (b) - Fitness Requirements
Modified
30
150
0
250.713(a), (b) - Foundation Requirements
Modified
900
4500
0
250.714 - Dropped Objects Plan
Modified
40
1600
0
250.715 - GPS for MODUs - Install
Modified
20
0
6500
250.715 - GPS for MODUs - Monthly tracking fee
Modified
40
0
24000
250.715 - GPS for MODUs - Rent GPS
Modified
40
0
72000
250.715 - GPS for MODUs - tracking/locator data
Modified
5
5
0
250.720(a) - Interrupting Operations
Modified
150
750
0
250.720(a)(3) - Resuming Operations
Modified
35
18
0
250.720(d) - Intervention Operations
Modified
20
10
0
250.721(d), (f), (g) - plans to re-cement, repair, etc.
Modified
10
5
0
250.721(g)(5) - Test Results
Modified
150
113
0
250.721(g)(6) - failed negative pressure test
Modified
10
10
0
250.722 - Evaluation results report
Modified
30
90
0
250.722 - Successful pressure test
Modified
25
13
0
250.722(b)(3) - Pressure test after repairs
Modified
5
5
0
250.723(d) - Request exceptions prior to moving rig
Modified
20
30
0
250.724 - Transmit RTM data onshore
Modified
30
64800
0
250.724(c) - Develop and implement a RTM plan
Modified
20
100
0
250.730(a)(4) - Schematic drawings
Modified
15
360
0
250.730(c)(1) - Written notice of equipment failure
Modified
40
80
0
250.730(c)(2) - Analysis report re equipment failure
Modified
40
200
0
250.730(c)(2) - Extension Request
Modified
10
10
0
250.730(c)(3) - Submit report re design change/modified procedures
Modified
2
10
0
250.730(d)(1) - Alternate approval from using to API Spec. Q1
Modified
1
5
0
250.732(a) - Submit ITP verification
Modified
1300
13000
6630000
250.732(c) - Verification that an ITP conducted detailed reviews
Modified
10
100
0
250.732(d) - Documentation that demonstrates compliance
Modified
10
3
0
250.734(a)(7) - Acoustic control system
Modified
1
5
0
250.734(a)(7) - Additional information / acoustic control system
Modified
100
100
0
250.734(a)(9); 738(n) - Labeling
Modified
60
90
0
250.737(a)(4) (d)(10) - 21-day BOP testing frequency
Modified
12
36
0
250.737(a)(4) (d)(10) - Quarterly reports
Modified
48
48
0
250.737(c); 746(a), (b), (c), (d) - Record time, date, and results
Modified
13300
103075
0
250.737(d)(12) - Document all autoshear, EDS, and deadman test results
Modified
140
70
0
250.737(d)(12) - Make available upon request.
Modified
10
10
0
250.737(d)(2), (d)(3), (d)(4) - Notify DM 72 hours prior to testing
Modified
430
108
0
250.737(d)(2), (d)(3), (d)(4) - Results w/in 72 hours after completion
Modified
1
6
0
250.737(d)(5) - Alternating testing schedule
Modified
50
25
0
250.737(e) - 72 hour advance notice of location of shearing ram tests
Modified
15
4
0
250.738(f) - BOP configuration changes
Modified
5
3
0
250.738(g) - Demonstrate well-control procedures
Modified
15
15
0
250.738(i) - ITP report - fit for service
Modified
5
3
0
250.738(k) - Latching up BOP stack/re-establishing power
Modified
2
2
0
250.738(m) - ITP report re-equipment design and suitability
Modified
40
80
0
250.738(o) - ITP report re failure of redundant control
Modified
15
15
0
250.738; 746(e) - DM Approval
Modified
10
5
0
250.738; 746(e) - DM Approval - 2 barriers in place prior to BOP removal
Modified
5
5
0
250.738; 746(e) - DM Approval - Prior to resuming operations for new/repaired/reconfigured BOP
Modified
50
13
0
250.738; 746(e) - DM Approval - Put well in safe condition
Modified
25
25
0
250.738; 746(e) - DM Approval - Well control demands above rating pressure
Modified
15
15
0
250.738; 746(e) - DM Approval - problems, issues, leaks
Modified
25
25
0
250.739 - meet/exceed API Standard 53
Modified
350
3413
0
250.739(b) - ITP report documenting inspection
Modified
40
200
0
250.740; 711(b); 724(b); 738(c); 745; 746 - Daily report/records
Modified
18000
9000
0
250.740; 711(b); 724(b); 738(c); 745; 746 - Required Info.
Modified
25
25
0
250.740; 741; 724(b) - Drilling records
Modified
40
86
0
250.740; 741; 724(b) - Retain data for 2 years after completion
Modified
18000
9000
0
250.742 - Core analyses
Modified
18000
18000
0
250.742 - Directional and vertical-well surveys
Modified
18000
18000
0
250.742 - Velocity profiles and surveys
Modified
40
40
0
250.742 - Well logging operations
Modified
40
120
0
250.745 - Varies records of operations
Modified
40
60
0
250.746 - Casing and liner presser tests
Modified
18000
36000
0
250.746(f) - Retain pressure tests, actuations, and inspections in daily report
Modified
40
60
0
250.751 - BOP and coiled tubing tests
Modified
18000
49500
0
Total burden requested under this ICR:
150081
350615
6732500
To view an IC, click on IC Title