Display additional information by clicking on the following:
All
Brief and OIRA conclusion
Abstract/Justification
Legal Statutes
Rulemaking
FR Notices/Comments
IC List
Burden
Misc.
Common Form Info.
Certification
View Information Collection (IC) List
View Supporting Statement and Other Documents
Please note that the OMB number and expiration date may not have been determined when this Information Collection Request and associated Information Collection forms were submitted to OMB. The approved OMB number and expiration date may be found by clicking on the Notice of Action link below.
View ICR - OIRA Conclusion
OMB Control No:
1014-0028
ICR Reference No:
201811-1014-001
Status:
Historical Inactive
Previous ICR Reference No:
201607-1014-001
Agency/Subagency:
DOI/BSEE
Agency Tracking No:
1014-0028 - Sub G - WCR
Title:
30 CFR Part 250, Subpart G, Well Operations and Equipment.
Type of Information Collection:
Revision of a currently approved collection
Common Form ICR:
No
Type of Review Request:
Regular
OIRA Conclusion Action:
Comment filed on proposed rule and continue
Conclusion Date:
03/12/2019
Retrieve Notice of Action (NOA)
Date Received in OIRA:
12/13/2018
Terms of Clearance:
In accordance with 5 CFR 1320, OMB is filing comment and withholding approval at this time. The agency shall examine public comment in response to the proposed rulemaking and will include in the supporting statement of the next ICR--to be submitted to OMB at the final rule stage--a description of how the agency has responded to any public comments on the ICR, including comments on maximizing the practical utility of the collection and minimizing the burden. Given that the cost estimates presented rely largely on non-public data, the agency is requested to work with OMB to increase the amount of quality supporting information underlying the cost estimates before this information collection is submitted for renewal. Lastly, the supporting statement submitted at final rule stage should include any changes that occurred between the proposed and final rule related to this ICR.
Inventory as of this Action
Requested
Previously Approved
Expiration Date
07/31/2019
36 Months From Approved
07/31/2019
Responses
8,143
0
8,143
Time Burden (Hours)
87,628
0
87,628
Cost Burden (Dollars)
0
0
0
Abstract:
The Bureau of Safety and Environmental Enforcement (BSEE) regulations located at 30 CFR Part 250, Subpart G--Well Operations and Equipment consolidate common equipment and operational functions regarding Blowout Preventers (BOPs) to ensure safe drilling, workover, completion, and decommissioning operations and to protect the human, marine, and coastal environment. BSEE analyzes and evaluates these information/requirements to reduce the likelihood of a similar Deepwater Horizon event and to reduce the risk of fatalities, injuries, and spills.
Authorizing Statute(s):
US Code:
43 USC 1334
Name of Law: Outer Continental Shelf (OCS) Lands Act
US Code:
30 USC 1751
Name of Law: Federal Oil and Gas Royalty Management Act
US Code:
31 USC 9701
Name of Law: Independent Offices Appropriations Act
Citations for New Statutory Requirements:
None
Associated Rulemaking Information
RIN:
Stage of Rulemaking:
Federal Register Citation:
Date:
1014-AA39
Proposed rulemaking
83 FR 22128
05/11/2018
Federal Register Notices & Comments
Did the Agency receive public comments on this ICR?
Yes
Number of Information Collection (IC) in this ICR:
74
IC Title
Form No.
Form Name
250.710(a) - Safety Meetings
250.710(b); 738(p) - Well-Control Drill Plan
250.711(b), (c) - Daily Drill Report
250.712(a), (b), (f) - Notify BSEE of Rig Movements
250.712(a), (b), (f) - Rig Movement Notification Report
BSEE-0144
Rig Movement Notification Report
250.712(a), (b), (f) - Updated Rig Movement Form
250.712(c), (e) - Warm or Cold Stacked
250.712(d) - Construction Repairs/Mods to MODU/Rig
250.713(a), (b) - Fitness Requirements
250.713(a), (b) - Foundation Requirements
250.714 - Dropped Objects Plan
250.715 - GPS for MODUs - Install
250.715 - GPS for MODUs - Monthly tracking fee
250.715 - GPS for MODUs - Rent GPS
250.715 - GPS for MODUs - tracking/locator data
250.720(a) - Interrupting Operations
250.720(a)(3) - Resuming Operations
250.720(d) - Intervention Operations
250.721(d), (f), (g) - plans to re-cement, repair, etc.
250.721(g)(5) - Test Results
250.721(g)(6) - failed negative pressure test
250.722 - Evaluation results report
250.722 - Successful pressure test
250.722(b)(3) - Pressure test after repairs
250.723(d) - Request exceptions prior to moving rig
250.724 - Transmit RTM data onshore
250.724(c) - Develop and implement a RTM plan
250.730(a)(4) - Schematic drawings
250.730(c)(1) - Written notice of equipment failure
250.730(c)(2) - Analysis report re equipment failure
250.730(c)(2) - Extension Request
250.730(c)(3) - Submit report re design change/modified procedures
250.730(d)(1) - Alternate approval from using to API Spec. Q1
250.732(a) - Submit ITP verification
250.732(c) - Verification that an ITP conducted detailed reviews
250.732(d) - Documentation that demonstrates compliance
250.734(a)(7) - Acoustic control system
250.734(a)(7) - Additional information / acoustic control system
250.734(a)(9); 738(n) - Labeling
250.737(a)(4) (d)(10) - 21-day BOP testing frequency
250.737(a)(4) (d)(10) - Quarterly reports
250.737(c); 746(a), (b), (c), (d) - Record time, date, and results
250.737(d)(12) - Document all autoshear, EDS, and deadman test results
250.737(d)(12) - Make available upon request.
250.737(d)(2), (d)(3), (d)(4) - Notify DM 72 hours prior to testing
250.737(d)(2), (d)(3), (d)(4) - Results w/in 72 hours after completion
250.737(d)(5) - Alternating testing schedule
250.737(e) - 72 hour advance notice of location of shearing ram tests
250.738(f) - BOP configuration changes
250.738(g) - Demonstrate well-control procedures
250.738(i) - ITP report - fit for service
250.738(k) - Latching up BOP stack/re-establishing power
250.738(m) - ITP report re-equipment design and suitability
250.738(o) - ITP report re failure of redundant control
250.738; 746(e) - DM Approval
250.738; 746(e) - DM Approval - 2 barriers in place prior to BOP removal
250.738; 746(e) - DM Approval - Prior to resuming operations for new/repaired/reconfigured BOP
250.738; 746(e) - DM Approval - Put well in safe condition
250.738; 746(e) - DM Approval - Well control demands above rating pressure
250.738; 746(e) - DM Approval - problems, issues, leaks
250.739 - meet/exceed API Standard 53
250.739(b) - ITP report documenting inspection
250.740; 711(b); 724(b); 738(c); 745; 746 - Daily report/records
250.740; 711(b); 724(b); 738(c); 745; 746 - Required Info.
250.740; 741; 724(b) - Drilling records
250.740; 741; 724(b) - Retain data for 2 years after completion
250.742 - Core analyses
250.742 - Directional and vertical-well surveys
250.742 - Velocity profiles and surveys
250.742 - Well logging operations
250.745 - Varies records of operations
250.746 - Casing and liner presser tests
250.746(f) - Retain pressure tests, actuations, and inspections in daily report
250.751 - BOP and coiled tubing tests
Application for Permit to Modify (APM/revised APM) - 250.460;465;518(f);619(f);701-738;1704(g)
BSEE-0124
Application for Permit to Modify (APM)
Applications for Permit to Drill (APD/revised APD) - 250.410-418;420(a)(7);423(c)(1);428(b),(k);701-738
BSEE-0123, BSEE-0123S
Application for Permit to Drill (APD)
,
Supplemental APD Information Sheet
Subpart B - 250.287; 291; 292
Subpart D - 250.420(b);421(b);423(c);428(c),(d),(k);462(c),(d),(e);465(a),(b);721(g);743(a),(b),(c);744;746(e);1704(h)
BSEE-0125, BSEE-0133, BSEE-0133S
End of Operations Report
,
Well Activity Report (WAR)
,
Open Hole Data Report (Supplement to the WAR)
Subpart G - BOP System Requirements - 250.730-739;746a,b,c,d,e
Subpart G - Records and Reporting Requirements - 250.711(b);738(c);740-746
Subpart G - Rig Requirements - 250.710 - 715; 738(p)
BSEE-0144
Rig Movement Notification Report
Subpart G - Well Operations - 250.720 - 724; 744(a)
Burden increases because of Program Change due to Agency Discretion:
Yes
Burden Increase Due to:
Changing Regulations
Burden decreases because of Program Change due to Agency Discretion:
No
Burden Reduction Due to:
Short Statement:
The current OMB inventory for this collection is 87,628 burden hours. In this submission, we are requesting a total of 160,842 burden hours. This represents an adjustment increase of 69,166 burden hours. The adjustment increase is due to relocating hour burdens from multiple separate subparts (ICRs) throughout 30 CFR 250 created from the original BOP rule (1014-AA11). This also represents a program increase of 4,048 burden hours due to this final rulemaking, 1014-AA39, Blowout Preventer Systems and Well Control Revisions. The OMB non-hour cost burden is an adjustment increase of $102,500 and also comes from multiple subparts throughout 30 CFR 250 that were approved in other ICRs. In this submission, we are requesting a total of $867,500. This represents a program increase of $765,000 for Independent Third Party costs being added due to this final rulemaking, 1014-AA39, Blowout Preventer Systems and Well Control Revisions.
Annual Cost to Federal Government:
$10,133,088
Does this IC contain surveys, censuses, or employ statistical methods?
No
Does this ICR request any personally identifiable information (see
OMB Circular No. A-130
for an explanation of this term)? Please consult with your agency's privacy program when making this determination.
No
Does this ICR include a form that requires a Privacy Act Statement (see
5 U.S.C. §552a(e)(3)
)? Please consult with your agency's privacy program when making this determination.
No
Is this ICR related to the Affordable Care Act [Pub. L. 111-148 & 111-152]?
No
Is this ICR related to the Dodd-Frank Wall Street Reform and Consumer Protection Act, [Pub. L. 111-203]?
No
Is this ICR related to the American Recovery and Reinvestment Act of 2009 (ARRA)?
No
Is this ICR related to the Pandemic Response?
Uncollected
Agency Contact:
Nicole Mason 703 787-1605 nicole.mason@boemre.gov
Common Form ICR:
No
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(a) It is necessary for the proper performance of agency functions;
(b) It avoids unnecessary duplication;
(c) It reduces burden on small entities;
(d) It uses plain, coherent, and unambiguous language that is understandable to respondents;
(e) Its implementation will be consistent and compatible with current reporting and recordkeeping practices;
(f) It indicates the retention periods for recordkeeping requirements;
(g) It informs respondents of the information called for under 5 CFR 1320.8 (b)(3) about:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
(h) It was developed by an office that has planned and allocated resources for the efficient and effective management and use of the information to be collected.
(i) It uses effective and efficient statistical survey methodology (if applicable); and
(j) It makes appropriate use of information technology.
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.