Skip to main content
An official website of the United States government
The .gov means it's official.
Federal government websites often end in .gov or .mil. Before sharing sensitive information, make sure you're on a federal government site.
The site is secure.
The https:// ensures that you are connecting to the official website and that any information you provide is encrypted and transmitted securely.
Search:
Agenda
Reg Review
ICR
This script is used to control the display of information in this page.
Display additional information by clicking on the following:
All
Brief and OIRA conclusion
Abstract/Justification
Legal Statutes
Rulemaking
FR Notices/Comments
IC List
Burden
Misc.
Common Form Info.
Certification
View Information Collection (IC) List
View Supporting Statement and Other Documents
Please note that the OMB number and expiration date may not have been determined when this Information Collection Request and associated Information Collection forms were submitted to OMB. The approved OMB number and expiration date may be found by clicking on the Notice of Action link below.
View ICR - OIRA Conclusion
OMB Control No:
1014-0028
ICR Reference No:
201908-1014-001
Status:
Active
Previous ICR Reference No:
201905-1014-009
Agency/Subagency:
DOI/BSEE
Agency Tracking No:
1014-0028 - Sub G '20
Title:
30 CFR Part 250, Subpart G, Well Operations and Equipment.
Type of Information Collection:
Extension without change of a currently approved collection
Common Form ICR:
No
Type of Review Request:
Regular
OIRA Conclusion Action:
Approved with change
Conclusion Date:
01/31/2020
Retrieve Notice of Action (NOA)
Date Received in OIRA:
11/27/2019
Terms of Clearance:
In accordance with 5 CFR 1320, the information collection is approved for three years.
Inventory as of this Action
Requested
Previously Approved
Expiration Date
01/31/2023
36 Months From Approved
01/31/2020
Responses
43,408
0
43,408
Time Burden (Hours)
160,842
0
160,842
Cost Burden (Dollars)
867,500
0
867,500
Abstract:
The Bureau of Safety and Environmental Enforcement (BSEE) regulations located at 30 CFR Part 250, Subpart G--Well Operations and Equipment consolidate common equipment and operational functions regarding Blowout Preventers (BOPs) to ensure safe drilling, workover, completion, and decommissioning operations and to protect the human, marine, and coastal environment. BSEE analyzes and evaluates these information/requirements to reduce the likelihood of a similar Deepwater Horizon event and to reduce the risk of fatalities, injuries, and spills.
Authorizing Statute(s):
US Code:
43 USC 1334
Name of Law: Outer Continental Shelf (OCS) Lands Act
US Code:
31 USC 9701
Name of Law: Independent Offices Appropriations Act
US Code:
30 USC 1751
Name of Law: Federal Oil and Gas Royalty Management Act
Citations for New Statutory Requirements:
None
Associated Rulemaking Information
RIN:
Stage of Rulemaking:
Federal Register Citation:
Date:
Not associated with rulemaking
Federal Register Notices & Comments
60-day Notice:
Federal Register Citation:
Citation Date:
84 FR 35418
07/23/2019
30-day Notice:
Federal Register Citation:
Citation Date:
84 FR 65418
11/27/2019
Did the Agency receive public comments on this ICR?
No
Number of Information Collection (IC) in this ICR:
74
IC Title
Form No.
Form Name
250.710(a) - Safety Meetings
250.710(b); 738(p) - Well-Control Drill Plan
250.711(b), (c) - Daily Drill Report
250.712(a), (b), (f) - Notify BSEE of Rig Movements
250.712(a), (b), (f) - Rig Movement Notification Report
BSEE-0144
Rig Movement Notification Report
250.712(a), (b), (f) - Updated Rig Movement Form
250.712(c), (e) - Warm or Cold Stacked
250.712(d) - Construction Repairs/Mods to MODU/Rig
250.713(a), (b) - Fitness Requirements
250.713(a), (b) - Foundation Requirements
250.714 - Dropped Objects Plan
250.715 - GPS for MODUs - Install
250.715 - GPS for MODUs - Monthly tracking fee
250.715 - GPS for MODUs - Rent GPS
250.715 - GPS for MODUs - tracking/locator data
250.720(a) - Interrupting Operations
250.720(a)(3) - Resuming Operations
250.720(d) - Intervention Operations
250.721(d), (f), (g) - plans to re-cement, repair, etc.
250.721(g)(5) - Test Results
250.721(g)(6) - failed negative pressure test
250.722 - Evaluation results report
250.722 - Successful pressure test
250.722(b)(3) - Pressure test after repairs
250.723(d) - Request exceptions prior to moving rig
250.724 - Transmit RTM data onshore
250.724(c) - Develop and implement a RTM plan
250.730(a)(4) - Schematic drawings
250.730(c)(1) - Written notice of equipment failure
250.730(c)(2) - Analysis report re equipment failure
250.730(c)(2) - Extension Request
250.730(c)(3) - Submit report re design change/modified procedures
250.730(d)(1) - Alternate approval from using to API Spec. Q1
250.732(a) - Submit ITP verification
250.732(c) - Verification that an ITP conducted detailed reviews
250.732(d) - Documentation that demonstrates compliance
250.734(a)(7) - Acoustic control system
250.734(a)(7) - Additional information / acoustic control system
250.734(a)(9); 738(n) - Labeling
250.737(a)(4) (d)(10) - 21-day BOP testing frequency
250.737(a)(4) (d)(10) - Quarterly reports
250.737(c); 746(a), (b), (c), (d) - Record time, date, and results
250.737(d)(12) - Document all autoshear, EDS, and deadman test results
250.737(d)(12) - Make available upon request.
250.737(d)(2), (d)(3), (d)(4) - Notify DM 72 hours prior to testing
250.737(d)(2), (d)(3), (d)(4) - Results w/in 72 hours after completion
250.737(d)(5) - Alternating testing schedule
250.737(e) - 72 hour advance notice of location of shearing ram tests
250.738(f) - BOP configuration changes
250.738(g) - Demonstrate well-control procedures
250.738(i) - ITP report - fit for service
250.738(k) - Latching up BOP stack/re-establishing power
250.738(m) - ITP report re-equipment design and suitability
250.738(o) - ITP report re failure of redundant control
250.738; 746(e) - DM Approval
250.738; 746(e) - DM Approval - 2 barriers in place prior to BOP removal
250.738; 746(e) - DM Approval - Prior to resuming operations for new/repaired/reconfigured BOP
250.738; 746(e) - DM Approval - Put well in safe condition
250.738; 746(e) - DM Approval - Well control demands above rating pressure
250.738; 746(e) - DM Approval - problems, issues, leaks
250.739 - meet/exceed API Standard 53
250.739(b) - ITP report documenting inspection
250.740; 711(b); 724(b); 738(c); 745; 746 - Daily report/records
250.740; 711(b); 724(b); 738(c); 745; 746 - Required Info.
250.740; 741; 724(b) - Drilling records
250.740; 741; 724(b) - Retain data for 2 years after completion
250.742 - Core analyses
250.742 - Directional and vertical-well surveys
250.742 - Velocity profiles and surveys
250.742 - Well logging operations
250.745 - Varies records of operations
250.746 - Casing and liner presser tests
250.746(f) - Retain pressure tests, actuations, and inspections in daily report
250.751 - BOP and coiled tubing tests
ICR Summary of Burden
Total Approved
Previously Approved
Change Due to New Statute
Change Due to Agency Discretion
Change Due to Adjustment in Estimate
Change Due to Potential Violation of the PRA
Annual Number of Responses
43,408
43,408
0
0
0
0
Annual Time Burden (Hours)
160,842
160,842
0
0
0
0
Annual Cost Burden (Dollars)
867,500
867,500
0
0
0
0
Burden increases because of Program Change due to Agency Discretion:
No
Burden Increase Due to:
Burden decreases because of Program Change due to Agency Discretion:
No
Burden Reduction Due to:
Short Statement:
Annual Cost to Federal Government:
$10,374,352
Does this IC contain surveys, censuses, or employ statistical methods?
No
Does this ICR request any personally identifiable information (see
OMB Circular No. A-130
for an explanation of this term)? Please consult with your agency's privacy program when making this determination.
No
Does this ICR include a form that requires a Privacy Act Statement (see
5 U.S.C. §552a(e)(3)
)? Please consult with your agency's privacy program when making this determination.
No
Is this ICR related to the Affordable Care Act [Pub. L. 111-148 & 111-152]?
No
Is this ICR related to the Dodd-Frank Wall Street Reform and Consumer Protection Act, [Pub. L. 111-203]?
No
Is this ICR related to the American Recovery and Reinvestment Act of 2009 (ARRA)?
No
Is this ICR related to the Pandemic Response?
Uncollected
Agency Contact:
Nicole Mason 703 787-1605 nicole.mason@boemre.gov
Common Form ICR:
No
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(a) It is necessary for the proper performance of agency functions;
(b) It avoids unnecessary duplication;
(c) It reduces burden on small entities;
(d) It uses plain, coherent, and unambiguous language that is understandable to respondents;
(e) Its implementation will be consistent and compatible with current reporting and recordkeeping practices;
(f) It indicates the retention periods for recordkeeping requirements;
(g) It informs respondents of the information called for under 5 CFR 1320.8 (b)(3) about:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
(h) It was developed by an office that has planned and allocated resources for the efficient and effective management and use of the information to be collected.
(i) It uses effective and efficient statistical survey methodology (if applicable); and
(j) It makes appropriate use of information technology.
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
Certification Date:
11/27/2019