View Rule
View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
FERC | RIN: 1902-AD46 | Publication ID: Fall 2008 |
Title: Preliminary Permits for Wave, Current, and Instream New Technology Hydropower Projects | |
Abstract: The Commission seeks comments on how it should treat applications for preliminary permits to study hydropower projects involving proposals to utilize wave, current, and instream new technology methods to develop hydropower. The Commission is also seeking comments on how it should oversee any such permits during their terms. The Commission also sets an interim policy pending the outcome of this proceeding. (Docket No. RM07-8-000). | |
Agency: Federal Energy Regulatory Commission(FERC) | Priority: Substantive, Nonsignificant |
RIN Status: Previously published in the Unified Agenda | Agenda Stage of Rulemaking: Proposed Rule Stage |
Major: Undetermined | Unfunded Mandates: No |
CFR Citation: 18 CFR 1 | |
Legal Authority: 42 USC 7101 to 7352 |
Legal Deadline:
None |
|||||||||
Timetable:
|
Regulatory Flexibility Analysis Required: No | Government Levels Affected: None |
Federalism: No | |
Included in the Regulatory Plan: No | |
RIN Data Printed in the FR: No | |
Agency Contact: Merrill Hathaway Supervisory Attorney, Office of the General Counsel Federal Energy Regulatory Commission 888 First Street NE., Washington, DC 20426 Phone:202 502-8825 Email: merrill.hathaway@ferc.gov |