View Rule
View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
FERC | RIN: 1902-AD67 | Publication ID: Spring 2009 |
Title: ●Western Electricity Coordinating Council Regional Reliability Standard Regarding Automatic Time Error Correction | |
Abstract: The Commission proposes to approve a regional Reliability Standard, BAL-004-WECC-01 (Automatic Time Error Correction), submitted to the Commission by the North American Electric Reliability Corporation. The Commission also proposed to direct WECC to develop several modifications to the regional Reliability Standard requiring balancing authorities within the Western Interconnection to maintain interconnection frequency within a predefined frequency profile and ensure that time error corrections are effectively conducted in a manner that does not adversely affect the reliability of the Interconnection. (Docket No. RM08-12-000). | |
Agency: Federal Energy Regulatory Commission(FERC) | Priority: Substantive, Nonsignificant |
RIN Status: First time published in the Unified Agenda | Agenda Stage of Rulemaking: Proposed Rule Stage |
Major: No | Unfunded Mandates: No |
CFR Citation: 18 CFR 40 | |
Legal Authority: 16 USC 824o |
Legal Deadline:
None |
||||||||||||
Timetable:
|
Regulatory Flexibility Analysis Required: No | Government Levels Affected: None |
Small Entities Affected: No | Federalism: No |
Included in the Regulatory Plan: No | |
RIN Data Printed in the FR: No | |
Agency Contact: Jonathan First Legal Information, Office of the General Counsel Federal Energy Regulatory Commission 888 First Street NE, Washington, DC 20426 Phone:202 502-8529 Email: jonathan.first@ferc.gov Katherine Waldbauer Attorney Federal Energy Regulatory Commission 888 First Street NE., Washington, DC 20426 Phone:202 502-8232 Email: katherine.waldbauer@ferc.gov |