View Rule
View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
FCC | RIN: 3060-AH65 | Publication ID: Spring 2009 |
Title: New Advanced Wireless Services (ET Docket No. 00-258) | |
Abstract: This proceeding explores the possible uses of frequency bands below 3 GHz to support the introduction of new advanced wireless services, including third generations as well as future generations of wireless systems. Advanced wireless systems could provide for a wide range of voice data and broadband services over a variety of mobile and fixed networks. The Third Notice of Proposed Rulemaking discusses the frequency bands that are still under consideration in this proceeding and invites additional comments on their disposition. Specifically, it addresses the Unlicensed Personal Communications Service (UPCS) band at 1910-1930 MHz, the Multipoint Distribution Service (MDS) spectrum at 2155-2160/62 MHz bands, the Emerging Technology spectrum, at 2160-2165 MHz, and the bands reallocated from MSS 91990-2000 MHz, 2020-2025 MHz, and 2165-2180 MHz. We seek comment on these bands with respect to using them for paired or unpaired Advance Wireless Service (AWS) operations or as relocation spectrum for existing services. The 7th Report and Order facilitates the introduction of Advanced Wireless Service (AWS) in the band 1710-1755 MHz--an integral part of a 90 MHz spectrum allocation recently reallocated to allow for such new and innovative wireless services. We largely adopt the proposals set forth in our recent AWS Fourth NPRM in this proceeding that are designed to clear the 1710-1755 MHz band of incumbent Federal Government operations that would otherwise impede the development of new nationwide AWS services. These actions are consistent with previous actions in this proceeding and with the United States Department of Commerce, National Telecommunications and Information Administration (NTIA) 2002 Viability Assessment, which addressed relocation and reaccommodation options for Federal Government operations in the band. The 8th Report and Order reallocated the 2155-2160 MHz band for Fixed and Mobile services and designates the 2155-2175 MHz band for Advanced Wireless Service (AWS) use. This proceeding continues the Commission's ongoing efforts to promote spectrum utilization and efficiency with regard to the provision of new services, including Advanced Wireless Services. The Order requires Broadband Radio Service (BRS) licensees in the 2150-2160/62 MHz band to provide information on the construction status and operational parameters of each incumbent BRS system that would be the subject of relocation. The Notice of Proposed Rule Making requested comments on the specific relocation procedures applicable to Broadband Radio Service (BRS) operations in the 2150-2160/62 MHz band, which the Commission recently decided will be relocated to the newly restructured 2495-2690 MHz band. The Commission also requested comments on the specific relocation procedures applicable to Fixed Microwave Service (FS) operations in the 2160-2175 MHz band. The Office of Engineering and Technology (OET) and the Wireless Telecommunications Bureau (WTB) set forth the specific data that Broadband Radio Service (BRS) licensees in the 2150-2160/62 MHz band must file along with the deadline date and procedures for filing this data on the Commission's Universal Licensing System (ULS). The data will assist in determining future AWS licensee's relocation obligations. The 9th Report and Order established procedures for the relocation of Broadband Radio Service (BRS) operations from the 2150-2160/62 MHz band, as well as for the relocation of Fixed Microwave Service (FS) operations from the 2160-2175 MHz band, and modified existing relocation procedures for the 2110-2150 MHz and 2175-2180 MHz bands. It also established cost-sharing rules to identify the reimbursement obligations for Advanced Wireless Service (AWS) and Mobile Satellite Service (MSS) entrants benefiting from the relocation of incumbent FS operations in the 2110-2150 MHz and 2160-2200 MHz bands and AWS entrants benefiting from the relocation of BRS incumbents in the 2150-2160/62 MHz band. The Commission continues its ongoing efforts to promote spectrum utilization and efficiency with regard to the provision of new services, including AWS. The Order dismisses a petition for reconsideration filed by the Wireless Communications Association International, Inc. (WCA) as moot. Two petitions for Reconsideration were filed in response to the 9th Report and Order. | |
Agency: Federal Communications Commission(FCC) | Priority: Substantive, Nonsignificant |
RIN Status: Previously published in the Unified Agenda | Agenda Stage of Rulemaking: Long-Term Actions |
Major: No | Unfunded Mandates: No |
CFR Citation: 47 CFR 2 | |
Legal Authority: 47 USC 154(i) 47 USC 157(a) 47 USC 303(c) 47 USC 303(f) 47 USC 303(g) 47 USC 303(r) |
Legal Deadline:
None |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Timetable:
|
Additional Information: ET Docket No. 00-258 | |
Regulatory Flexibility Analysis Required: Yes | Government Levels Affected: Undetermined |
Small Entities Affected: Businesses | |
Included in the Regulatory Plan: No | |
RIN Data Printed in the FR: Yes | |
Agency Contact: Rodney Small Economist Federal Communications Commission Office of Engineering and Technology, 445 12th Street SW., Washington, DC 20554 Phone:202 418-2452 Fax:202 418-1944 Email: rodney.small@fcc.gov |