View Rule

View EO 12866 Meetings Printer-Friendly Version     Download RIN Data in XML

NRC RIN: 3150-AI19 Publication ID: Spring 2009 
Title: Consideration of Aircraft Impacts for New Nuclear Power Reactor Designs [NRC-2007-0009] 
Abstract: The proposed rule would amend the Commission’s regulations by requiring applicants for new nuclear power reactors to perform a design-specific assessment of the effects of the impact of a large, commercial aircraft. The applicant is required to use realistic analyses to identify and incorporate design features and functional capabilities to ensure, with reduced use of operator actions, that either the reactor core remains cooled or the containment remains intact, and either spent fuel cooling or spent fuel pool integrity is maintained. These requirements apply to applicants for new construction permits; new operating licenses that reference a new construction permit; new standard design certifications, renewal of any of the four existing design certifications if the design has not previously been amended to comply with the final rule; new standard design approvals; manufacturing licenses that don’t reference a standard design certification or standard design approval, or that reference a standard design certification issued before the effective date of the rule which has not been amended to comply with the rule; and combined licenses that don’t reference a standard design certification, standard design approval, or manufactured reactor, or that reference a standard design certification issued before the effective date of the rule which has not been amended to comply with the rule. In addition, these amendments contain requirements for control of changes to any design features or functional capabilities credited for ensuring that the design can withstand the effects of an aircraft impact. 
Agency: Nuclear Regulatory Commission(NRC)  Priority: Substantive, Nonsignificant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Final Rule Stage 
Major: No  Unfunded Mandates: No 
CFR Citation: 10 CFR 52   
Legal Authority: 42 USC 2201    42 USC 5841   
Legal Deadline:  None
Timetable:
Action Date FR Cite
NPRM  10/03/2007  72 FR 56287   
NPRM Comment Period End  12/17/2007    
Final Rule  06/00/2009    
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Small Entities Affected: No 
Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
Stewart Schneider
Nuclear Regulatory Commission
Office of Nuclear Material Safety and Safeguards,
Washington, DC 20555-0001
Phone:301 415-4123
Email: stewart.schneider@nrc.gov