View Rule
View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
EPA/WATER | RIN: 2040-AF06 | Publication ID: Spring 2010 |
Title: 2010 Effluent Guidelines Program Plan | |
Abstract: The Clean Water Act (CWA) requires EPA to establish national technology-based regulations known as "effluent limitations guidelines and standards" to reduce pollutant discharges from categories of industrial facilities. EPA similarly establishes technology-based regulations, termed "pretreatment standards," to reduce indirect pollutant discharges—those that are discharged to publicly-owned treatment works. The CWA also specifies effluent guideline planning and review requirements. There are different requirements for direct and indirect dischargers, but both specify annual review of promulgated effluent guidelines and pretreatment standards. One requirement is publication of an Effluent Guidelines Program Plan every 2 years. CWA section 304(m) specifies that the Plan must: (1) Establish a schedule for the annual review and revision of promulgated effluent guidelines, (2) identify categories of sources discharging toxic or non-conventional pollutants for which guidelines have not previously been published ("new categories"); and (3) establish a schedule for the promulgation of effluent guidelines identified under (2). We anticipate that the 2010 Plan will describe the results of the 2010 annual review, including, to the extent possible: (1) The outcome of the screening process; (2) EPA's selection of industrial categories for further study; and (3) the rationale for selecting categories for further study. The 2010 Plan will also summarize activities and accomplishments for studies of categories that were identified in the 2008 Final Plan. | |
Agency: Environmental Protection Agency(EPA) | Priority: Other Significant |
RIN Status: Previously published in the Unified Agenda | Agenda Stage of Rulemaking: Final Rule Stage |
Major: No | Unfunded Mandates: No |
CFR Citation: Not Yet Determined (To search for a specific CFR, visit the Code of Federal Regulations.) | |
Legal Authority: CWA 304 CWA 306 CWA 307 |
Legal Deadline:
|
|||||||||
Timetable:
|
Additional Information: SAN No. 5320; EPA publication information: Preliminary Plan - http://edocket.access.gpo.gov/2009/pdf/E9-30625.pdf; EPA Docket information: EPA-HQ-OW-2008-0517. | |
Regulatory Flexibility Analysis Required: No | Government Levels Affected: None |
Small Entities Affected: No | Federalism: No |
Included in the Regulatory Plan: No | |
RIN Information URL: www.epa.gov/guide/304m | |
RIN Data Printed in the FR: No | |
Agency Contact: Carey Johnston Environmental Protection Agency Office of Enforcement and Compliance Assurance 4303T, Washington, DC 20460 Phone:202 566-1014 Fax:202 566-1053 Email: johnston.carey@epa.gov Samantha Lewis Environmental Protection Agency Water 4303T, Washington, DC 20460 Phone:202 566-1058 Fax:202 566-1053 Email: lewis.samantha@epa.gov |