View Rule

View EO 12866 Meetings Printer-Friendly Version     Download RIN Data in XML

FERC RIN: 1902-AE19 Publication ID: Fall 2011 
Title: Version One Regional Reliability Standards for Facilities Design, Connections, and Maintenance; Protection and Control; and Voltage and Reactive 
Abstract: Under section 215 of the Federal Power Act, the Commission approved four revised regional Reliability Standards developed by the Western Electricity Coordinating Council and approved by the North American Electric Reliability Corporation, which the Commission has certified as the Electric Reliability Organization responsible for developing and enforcing mandatory Reliability Standards. These regional Reliability Standards have been designated by the Western Electricity Coordinating Council as FAC-501-WECC-1 - Transmission Maintenance, PRC-004-WECC-1 - Protection System and Remedial Action Scheme Misoperation, VAR-002-WECC-1 - Automatic Voltage Regulators, and VAR-501-WECC-1 - Power System Stabilizer. Reliability Standard FAC-501-WECC-1 addresses transmission maintenance for specified transmission paths in the Western Interconnection. Reliability Standard PRC-004-WECC-1 addresses the analysis of misoperations that occur on transmission and generation protection systems and remedial action schemes in the Western Interconnection. Reliability Standard VAR-002-WECC-1 is meant to ensure that automatic voltage regulators remain in service on synchronous generators and condensers in the Western Interconnection. Reliability Standard VAR-501-WECC-1 is meant to ensure that power system stabilizers remain in service on synchronous generators in the Western Interconnection. In addition, the Commission approved five new regional definitions applicable within the Western Interconnection, (Docket No. RM09-09-000). 
Agency: Federal Energy Regulatory Commission(FERC)  Priority: Substantive, Nonsignificant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Completed Actions 
Major: No  Unfunded Mandates: No 
CFR Citation: 18 CFR 40   
Legal Authority: 16 USC 824o   
Legal Deadline:  None
Timetable:
Action Date FR Cite
NPRM  12/22/2010  75 FR 80397   
NPRM Comment Period End  02/22/2011    
Final Rule (Order No. 751)  04/28/2011  76 FR 23690   
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Small Entities Affected: No  Federalism: No 
Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
Cory Lankford
Legal Information, Office of the General Counsel
Federal Energy Regulatory Commission
888 First Street NE,
Washington, DC 20426
Phone:202 502-6711
Email: cory.lankford@ferc.gov

Nick Henery
Technical Information, Office of Electric Reliability
Federal Energy Regulatory Commission
888 First Street NE.,
Washington, DC 20426
Phone:202 502-8636
Email: nick.henery@ferc.gov

Scott Sells
Technical Information, Office of Electric Reliability
Federal Energy Regulatory Commission
888 First Street, NE,
Washington, DC 20426
Phone:202 502-6664
Email: scott.sells@ferc.gov