View Rule
View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
DOE/EE | RIN: 1904-AC68 | Publication ID: Spring 2014 |
Title: Enforcement of Regional Standards for Residential Furnaces and Central Air Conditioners and Heat Pumps | |
Abstract: DOE has developed three separate possible approaches to enforcement of regional standards for residential furnaces and residential central air conditioners and heat pumps set forth by direct final rule published in the Federal Register on June 27, 2011 (76 FR 37549). Adoption of these regional standards was addressed on October 31, 2011 (76 FR 67037). DOE intends to select one of these three approaches, or a combination of elements in these approaches, as a framework for an enforcement plan for regional standards. DOE is also considering a possible waiver process for regional standards applicability. DOE is required to promulgate an enforcement final rule covering the enforcement of regional standards "[n]ot later than 15 months after the date of the issuance of a final rule that establishes a regional standard." 42 U.S.C. 6295(o)(6)(G)(ii)(III). | |
Agency: Department of Energy(DOE) | Priority: Substantive, Nonsignificant |
RIN Status: Previously published in the Unified Agenda | Agenda Stage of Rulemaking: Proposed Rule Stage |
Major: No | Unfunded Mandates: Undetermined |
CFR Citation: 10 CFR 429 10 CFR 430 | |
Legal Authority: 42 USC 62905(o)(6)(G)(ii)(l) |
Legal Deadline:
|
||||||||||||
Timetable:
|
Regulatory Flexibility Analysis Required: Undetermined | Government Levels Affected: Undetermined |
Federalism: Undetermined | |
Included in the Regulatory Plan: No | |
Public Comment URL: www.regulations.gov | |
RIN Data Printed in the FR: No | |
Agency Contact: Ashley Armstrong Director Regulatory Buildings, EE-5B Department of Energy Energy Efficiency and Renewable Energy Building Technologies Office, 1000 Independence Avenue SW, Washington, DC 20585 Phone:202 586-6590 Email: ashley.armstrong@ee.doe.gov |