This script search US Code. View Rule
Menu Item - Home
Menu Item - Agenda Main page
Menu Item - Historical Agenda
Menu Item - Historical Agenda
Menu Item - Agenda Search
Menu Item - Agenda XML Reports
Menu Item - EO Dashboard
Menu Item - Reg Review
Menu Item - EO Agency lists
Menu Item - EO Search
Menu Item - EO Historical Reports
Menu Item - Review Counts
Menu Item - OIRA Letters
Menu Item - EOM 12866 Search
Menu Item - EO XML Reports
Menu Item - ICR Dashboard page
Menu Item - ICR Main page
Menu Item - ICR Search
Menu Item - ICR XML Reports
Menu Item - FAQ
Menu Item - Additional Resources
Menu Item - Contact Us
Search: Agenda Reg Review ICR

View Rule

View EO 12866 Meetings Printer-Friendly Version     Download RIN Data in XML

DOT/FHWA RIN: 2125-AF64 Publication ID: Spring 2014 
Title: Value Engineering  
Abstract: This rulemaking will update 23 CFR part 627 to implement the changes made by section 1503 of the Moving Ahead for Progress in the 21st Century Act (MAP-21). The general intent and requirements of the Value Engineering (VE) regulation will remain the same. Specific changes to the regulation include: specifying that a VE analysis is required for each project on the National Highway System (NHS) with an estimated total project cost of $50 million or more that utilizes Federal-aid highway funding; specifying that a VE analysis is required for each bridge project on the NHS with an estimated total project cost of $40 million or more that utilizes Federal-aid highway funding; removing the VE analysis requirement for bridges off the NHS; clarifying that a VE analysis is no longer required for projects delivered using the design-build method of construction; and clarifying when a VE analysis should be conducted on projects delivered using the Construction Manager/General Contractor (CM/GC) method of contracting. 
Agency: Department of Transportation(DOT)  Priority: Substantive, Nonsignificant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Final Rule Stage 
Major: No  Unfunded Mandates: No 
CFR Citation: 23 CFR 627   
Legal Authority: 23 USC 106    sec 1503 of MAP-21   
Legal Deadline:  None
Action Date FR Cite
NPRM  08/29/2013  78 FR 53380   
NPRM Comment Period End  10/28/2013 
Final Rule  07/00/2014 
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Small Entities Affected: No  Federalism: No 
Included in the Regulatory Plan: No 
RIN Information URL:   Public Comment URL:  
RIN Data Printed in the FR: No 
Agency Contact:
Jon Obenberger
Department of Transportation
Federal Highway Administration
1200 New Jersey Ave, SE,
Washington, DC 20590

About Us   Vertical Spacer Spacer Related Resources   Vertical Spacer Spacer Disclosure   Vertical Spacer Spacer Accessibility   Vertical Spacer Spacer Privacy Policy   Vertical Spacer Spacer Contact Us