Title: Value Engineering | |
Abstract: This rulemaking will update 23 CFR part 627 to implement the changes made by section 1503 of the Moving Ahead for Progress in the 21st Century Act (MAP-21). The general intent and requirements of the Value Engineering (VE) regulation will remain the same. Specific changes to the regulation include: specifying that a VE analysis is required for each project on the National Highway System (NHS) with an estimated total project cost of $50 million or more that utilizes Federal-aid highway funding; specifying that a VE analysis is required for each bridge project on the NHS with an estimated total project cost of $40 million or more that utilizes Federal-aid highway funding; removing the VE analysis requirement for bridges off the NHS; clarifying that a VE analysis is no longer required for projects delivered using the design-build method of construction; and clarifying when a VE analysis should be conducted on projects delivered using the Construction Manager/General Contractor (CM/GC) method of contracting. | |
Agency: Department of Transportation(DOT) | Priority: Substantive, Nonsignificant |
RIN Status: Previously published in the Unified Agenda | Agenda Stage of Rulemaking: Final Rule Stage |
Major: No | Unfunded Mandates: No |
CFR Citation: 23 CFR 627 | |
Legal Authority: 23 USC 106 sec 1503 of MAP-21 |
Legal Deadline:
None |
||||||||||||
Timetable:
|
Regulatory Flexibility Analysis Required: No | Government Levels Affected: None |
Small Entities Affected: No | Federalism: No |
Included in the Regulatory Plan: No | |
RIN Information URL: www.regulations.gov | Public Comment URL: www.regulations.gov |
RIN Data Printed in the FR: No | |
Agency Contact: Jon Obenberger Department of Transportation Federal Highway Administration 1200 New Jersey Ave, SE, Washington, DC 20590 Phone:202-366-2221 Email: jon.obenberger@fhwa.dot.gov |