Abstract:
The Clean Air Act (CAA) requires EPA to review maximum achievable control technology (MACT) standards and to revise them "as necessary (taking into account developments in practices, processes and control technologies)" no less frequently than every 8 years. Under the "residual risk" provision of the CAA, EPA must evaluate the MACT standards within 8 years after promulgation and promulgate standards, if required, to provide an ample margin of safety to protect public health or prevent an adverse environmental effect while considering the economic impacts of controls, technological feasibility, uncertainties and any other relevant factors. The EPA promulgated National Emission Standards for Hazardous Air Pollutants (NESHAP) for Primary Aluminum Reduction Plants (found in 40 CFR part 63, subpart LL) in 1997. This NESHAP applies to the owner or operator of each new pitch storage tank or new or existing potline, paste production plant, or anode bake furnace associated with primary aluminum reduction which is located at a major source, as defined in 40 CFR section 63.2. The EPA proposed standards addressing residual risk and technology developments on December 6, 2011. If finalized, the proposed amendments would include new emissions standards for carbonyl sulfide emissions from new and existing potlines; new emissions standards for polycyclic organic matter (POM) from new and existing prebake potlines and existing pitch storage tanks; reduce the emissions standards for POM from existing Soderberg potlines; eliminate the startup, shutdown and malfunction exemption; and make certain other technical and editorial changes. |
|
Agency: Environmental Protection Agency(EPA) | Priority: Other Significant |
RIN Status: Previously published in the Unified Agenda | Agenda Stage of Rulemaking: Proposed Rule Stage |
Major: No | Unfunded Mandates: No |
CFR Citation: 40 CFR 112 | |
Legal Authority: 42 USC 7412 |
Legal Deadline:
|
|||||||||||||||
Timetable:
|
Additional Information: Docket #:EPA-HQ-OAR-2011-0797 | |
Regulatory Flexibility Analysis Required: No | Government Levels Affected: Federal, Local, State |
Small Entities Affected: No | Federalism: No |
Included in the Regulatory Plan: No | |
Sectors Affected: 33131 Alumina and Aluminum Production and Processing | |
RIN Data Printed in the FR: No | |
Agency Contact: David Putney Environmental Protection Agency Air and Radiation 109 T.W. Alexander Drive, Mail Code D-243-02, Research Triangle Park, NC 27711 Phone:919 541-2016 Fax:919 541-4991 Email: putney.david@epa.gov Rochelle Boyd Environmental Protection Agency Air and Radiation 109 T.W. Alexander Drive, Mail Code D-243-02, Research Triangle Park, NC 27711 Phone:919 541-1390 Email: boyd.rochelle@epa.gov |