View Rule

View EO 12866 Meetings Printer-Friendly Version     Download RIN Data in XML

DOI/OSMRE RIN: 1029-AC68 Publication ID: Spring 2015 
Title: Dam Safety 
Abstract:

This rule would revise OSMRE's impoundment regulations to incorporate appropriate elements of the Federal Guidelines for Dam Safety (FGDS), including requirements for emergency action plans and after-action reports. The rule would implement two December 2012 recommendations from the Office of the Inspector General. Rulemaking is required to revise the CFR.

 
Agency: Department of the Interior(DOI)  Priority: Substantive, Nonsignificant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Proposed Rule Stage 
Major: No  Unfunded Mandates: No 
CFR Citation: 30 CFR 816.49    30 CFR 817.49   
Legal Authority: 30 U.S.C. 1201 et seq.   
Legal Deadline:  None
Timetable:
Action Date FR Cite
NPRM  07/00/2015 
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Small Entities Affected: No  Federalism: No 
Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
Joshua Rockwell
Mining Engineer
Department of the Interior
Office of Surface Mining Reclamation and Enforcement
1951 Constitution Avenue NW.,
Washington, DC 20240
Phone:202 208-2633
Email: jrockwell@osmre.gov