View Rule
View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
DOI/OSMRE | RIN: 1029-AC68 | Publication ID: Spring 2015 |
Title: Dam Safety | |
Abstract:
This rule would revise OSMRE's impoundment regulations to incorporate appropriate elements of the Federal Guidelines for Dam Safety (FGDS), including requirements for emergency action plans and after-action reports. The rule would implement two December 2012 recommendations from the Office of the Inspector General. Rulemaking is required to revise the CFR. |
|
Agency: Department of the Interior(DOI) | Priority: Substantive, Nonsignificant |
RIN Status: Previously published in the Unified Agenda | Agenda Stage of Rulemaking: Proposed Rule Stage |
Major: No | Unfunded Mandates: No |
CFR Citation: 30 CFR 816.49 30 CFR 817.49 | |
Legal Authority: 30 U.S.C. 1201 et seq. |
Legal Deadline:
None |
||||||
Timetable:
|
Regulatory Flexibility Analysis Required: No | Government Levels Affected: None |
Small Entities Affected: No | Federalism: No |
Included in the Regulatory Plan: No | |
RIN Data Printed in the FR: No | |
Agency Contact: Joshua Rockwell Mining Engineer Department of the Interior Office of Surface Mining Reclamation and Enforcement 1951 Constitution Avenue NW., Washington, DC 20240 Phone:202 208-2633 Email: jrockwell@osmre.gov |