View Rule
View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
FERC | RIN: 1902-AE80 | Publication ID: Spring 2015 |
Title: Reliability Standard for Geomagnetic Disturbance Operations | |
Abstract:
Pursuant to section 215 of the Federal Power Act, the Commission approved Reliability Standard EOP–010–1 (Geomagnetic Disturbance Operations). The North American Electric Reliability Corporation, the Commission-certified Electric Reliability Organization, submitted the Reliability Standard for Commission approval in response to a Commission directive in Order No. 779. Reliability Standard EOP–010–1 is designed to mitigate the effects of geomagnetic disturbances on the Bulk-Power System by requiring responsible entities to implement Operating Plans and Operating Procedures or Processes. The Commission denied rehearing of Order No. 797-A (Docket Nos. RM14-1-000 and RM14-1-001). |
|
Agency: Federal Energy Regulatory Commission(FERC) | Priority: Substantive, Nonsignificant |
RIN Status: Previously published in the Unified Agenda | Agenda Stage of Rulemaking: Completed Actions |
Major: No | Unfunded Mandates: No |
CFR Citation: 18 CFR 40 | |
Legal Authority: 16 U.S.C. 824o |
Legal Deadline:
None |
|||||||||||||||||||||
Timetable:
|
Regulatory Flexibility Analysis Required: No | Government Levels Affected: None |
Federalism: No | |
Included in the Regulatory Plan: No | |
RIN Data Printed in the FR: No | |
Agency Contact: Matthew Vlissides Legal Information, Office of the General Counsel Federal Energy Regulatory Commission 888 First Street NE., Washington, DC 20426 Phone:202 502-8408 Email: matthew.vlissides@ferc.gov Michael Gandolfo Technical Information, Office of Electric Reliability Federal Energy Regulatory Commission 888 First Street NE, Washington, DC 20426 Phone:202 502-6817 Email: michael.gandolfo@ferc.gov |