View Rule
View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
STB | RIN: 2140-AB14 | Publication ID: Spring 2015 |
Title: Review of the General Purpose Costing System, Docket No. EP 431 (Sub-No. 4) | |
Abstract:
This Board has proposed certain changes to its general purpose costing system, the Uniform Railroad Costing System (URCS). Specifically, the Board has proposed to adjust how URCS calculates certain system-average unit costs in Phase II, thereby obviating the need for URCS to apply a separate make-whole adjustment in Phase III. The Board has also proposed other related changes to URCS that would result in more accurate movement costs, as well as changes to two of its reporting requirements, that would help to support the proposed changes. |
|
Agency: Surface Transportation Board(STB) | Priority: Substantive, Nonsignificant |
RIN Status: Previously published in the Unified Agenda | Agenda Stage of Rulemaking: Proposed Rule Stage |
Major: No | Unfunded Mandates: No |
CFR Citation: 49 CFR 1247 49 CFR 1248 | |
Legal Authority: 5 U.S.C. 605(b) 49 U.S.C. 721 49 U.S.C. 10707 49 U.S.C. 11144 49 U.S.C. 11145 |
Legal Deadline:
None |
|||||||||||||||
Timetable:
|
Regulatory Flexibility Analysis Required: No | Government Levels Affected: None |
Small Entities Affected: No | Federalism: No |
Included in the Regulatory Plan: No | |
RIN Information URL: www.stb.dot.gov | Public Comment URL: www.stb.dot.gov |
RIN Data Printed in the FR: No | |
Agency Contact: Jonathon Binet Branch Chief, Office of Proceedings Surface Transportation Board 395 E Street, SW, Washington, DC 20423-0001 Phone:202 245-0368 Email: jonathon.binet@stb.gov Michael J. Boyles Section Chief, Applied Economics and Special Studies, Office of Economics Surface Transportation Board 395 E Street, SW, Washington, DC 20423-0001 Phone:202 245-0336 TDD Phone:800 877-8339 Email: michael.boyles@stb.gov |