View Rule
View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
DOE/EE | RIN: 1904-AD10 | Publication ID: Spring 2016 |
Title: Test Procedures for Ceiling Fans | |
Abstract:
EPCA requires the Secretary to update test procedures for ceiling fans so that the DOE test procedure for these products measures the energy efficiency, use or estimated annual operating cost during a representative period of use. DOE must consider whether to amend the test procedures for ceiling fans at least once every seven years. |
|
Agency: Department of Energy(DOE) | Priority: Substantive, Nonsignificant |
RIN Status: Previously published in the Unified Agenda | Agenda Stage of Rulemaking: Final Rule Stage |
Major: No | Unfunded Mandates: No |
CFR Citation: 10 CFR 430 | |
Legal Authority: 42 U.S.C. 6293(b)(1) and (16)(A)(i) |
Legal Deadline:
|
||||||||||||||||||
Timetable:
|
Additional Information: URL for ceiling fan light kits is: http://www1.eere.energy.gov/buildings/appliance_standards/product.aspx/productid/76 | |
Regulatory Flexibility Analysis Required: No | Government Levels Affected: None |
Federalism: No | |
Included in the Regulatory Plan: No | |
RIN Information URL: www1.eere.energy.gov/buildings/appliance_standards/product.aspx/productid/25 | Public Comment URL: www.regulations.gov/#!docketDetail;D=EERE-2013-BT-TP-0050 |
RIN Data Printed in the FR: No | |
Related RINs: Related to 1904-AC87 | |
Agency Contact: Lucy DeButts Buildings Technologies Office, EE-5B Department of Energy Energy Efficiency and Renewable Energy 1000 Independence Avenue SW, Washington, DC 20585 Phone:202 287-1604 Email: lucy.debutts@ee.doe.gov |