View Rule
View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
EPA/OW | RIN: 2040-AF67 | Publication ID: Fall 2016 |
Title: ●Public Notice Requirements for Combined Sewer Overflow Discharges to the Great Lakes | |
Abstract: Section 425 of the 2016 Consolidated Appropriations Act requires EPA to work with the Great Lakes states to create public notice requirements for combined sewer overflow (CSO) discharges to the Great Lakes. The Act requires EPA to create notice requirements that address the method, contents and public availability of the notice. The Notice requirements include initial notification of CSO events, follow-up notice, and annual reporting. At a minimum, the contents of the notice are to include the dates and times of the applicable discharge; the volume of the discharge; and a description of any public access areas impacted by the discharge. The minimum content requirements are to be consistent for all affected states. EPA is working with the Great Lakes states to identify and evaluate options for implementing Section 425 of the Appropriations Act. EPA has also met with various stakeholder groups that represent municipalities, industry practitioners, and environmental organizations to hear each of their perspectives.EPA is holding a public listening session on September 14, 2016, in Chicago, Illinois to obtain information from the public to further inform this effort. | |
Agency: Environmental Protection Agency(EPA) | Priority: Substantive, Nonsignificant |
RIN Status: First time published in the Unified Agenda | Agenda Stage of Rulemaking: Proposed Rule Stage |
Major: No | Unfunded Mandates: No |
CFR Citation: 40 CFR 122 | |
Legal Authority: 33 U.S.C. 1342(l) and 1362(24) 33 U.S.C. 1361(a) |
Legal Deadline:
|
|||||||||
Overall Description of Deadline: Section 425 of the 2016 Consolidated |
|||||||||
Timetable:
|
Regulatory Flexibility Analysis Required: No | Government Levels Affected: Local, State |
Small Entities Affected: No | Federalism: Undetermined |
Included in the Regulatory Plan: No | |
RIN Information URL: https://www.epa.gov/npdes/combined-sewer-overflows-great-lakes-basin | |
RIN Data Printed in the FR: No | |
Agency Contact: Lisa Biddle Environmental Protection Agency Office of Water 4303T, 1200 Pennsylvania Avenue NW, Washington, DC 20460 Phone:202 566-0350 Email: biddle.lisa@epa.gov Kevin Weiss Environmental Protection Agency Office of Water 4203M, 1200 Pennsylvania Avenue NW, Washington, DC 20460 Phone:202 564-0742 Fax:202 564-0717 Email: weiss.kevin@epa.gov |