<?xml version="1.0" encoding="UTF-8" standalone="yes"?>
<REGINFO_RIN_DATA xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" RUN_DATE="2026-04-09-04:00" xsi:noNamespaceSchemaLocation="https://www.reginfo.gov/public/xml/REGINFO_XML_Ver10262011.xsd">
    <RIN_INFO>
        <RIN>1219-AB91</RIN>
        <PUBLICATION>
            <PUBLICATION_ID>202210</PUBLICATION_ID>
            <PUBLICATION_TITLE>The Regulatory Plan and the Unified Agenda of Federal Regulatory and Deregulatory Actions</PUBLICATION_TITLE>
        </PUBLICATION>
        <AGENCY>
            <CODE>1219</CODE>
            <NAME>Mine Safety and Health Administration</NAME>
            <ACRONYM>MSHA</ACRONYM>
        </AGENCY>
        <PARENT_AGENCY>
            <CODE>1200</CODE>
            <NAME>Department of Labor</NAME>
            <ACRONYM>DOL</ACRONYM>
        </PARENT_AGENCY>
        <RULE_TITLE>Safety Program for Surface Mobile Equipment</RULE_TITLE>
        <ABSTRACT><![CDATA[<!DOCTYPE html>
<html>
<head>
</head>
<body>
<p>MSHA would require mine operators to establish a written safety program for mobile equipment and powered haulage equipment (except belt conveyors) used at surface mines and surface areas of underground mines. Under this proposal, mine operators would be required to assess hazards and risks and identify actions to reduce accidents related to surface mobile equipment. The operators would have flexibility to develop and implement a safety program that would work best for their mining conditions and operations. This proposed rule would reduce fatal and nonfatal injuries involving surface mobile equipment used at mines and improve miner safety and health.</p>
</body>
</html>]]></ABSTRACT>
        <PRIORITY_CATEGORY>Other Significant</PRIORITY_CATEGORY>
        <RIN_STATUS>Previously Published in The Unified Agenda</RIN_STATUS>
        <RULE_STAGE>Final Rule Stage</RULE_STAGE>
        <MAJOR>Yes</MAJOR>
        <UNFUNDED_MANDATE_LIST>
            <UNFUNDED_MANDATE>No</UNFUNDED_MANDATE>
        </UNFUNDED_MANDATE_LIST>
        <CFR_LIST>
            <CFR>30 CFR 56</CFR>
            <CFR>30 CFR 57</CFR>
            <CFR>30 CFR 77</CFR>
        </CFR_LIST>
        <LEGAL_AUTHORITY_LIST>
            <LEGAL_AUTHORITY>30 U.S.C. 811</LEGAL_AUTHORITY>
            <LEGAL_AUTHORITY>30 U.S.C. 813(h)</LEGAL_AUTHORITY>
            <LEGAL_AUTHORITY>30 U.S.C. 957</LEGAL_AUTHORITY>
        </LEGAL_AUTHORITY_LIST>
        <LEGAL_DLINE_LIST/>
        <RPLAN_ENTRY>Yes</RPLAN_ENTRY>
        <RPLAN_INFO>
            <STMT_OF_NEED><![CDATA[<!DOCTYPE html>
<html>
<head>
</head>
<body>
<p>Although mine accidents are declining, accidents involving mobile and powered haulage equipment are still a leading cause of fatalities in mining.&nbsp; To reduce fatal and nonfatal injuries involving surface mobile equipment used at mines, MSHA is proposing a regulation that would require mine operators employing six or more miners to develop a written safety program for mobile and powered haulage equipment (excluding belt conveyors) at surface mines and surface areas of underground mines.&nbsp; The written safety program would include actions mine operators would take to identify hazards and risks to reduce accidents, injuries, and fatalities related to surface mobile equipment.</p>
</body>
</html>]]></STMT_OF_NEED>
            <LEGAL_BASIS><![CDATA[<!DOCTYPE html>
<html>
<head>
</head>
<body>
<p>Sections 101(a), 103(h), and 508 of the Federal Mine Safety and Health Act of 1977 (Mine Act), as amended (30 U.S.C. 811(a), 813(h), and 957).</p>
</body>
</html>]]></LEGAL_BASIS>
            <ALTERNATIVES><![CDATA[<!DOCTYPE html>
<html>
<head>
</head>
<body>
<p>MSHA considered requiring all mines, regardless of size, to develop and implement a written safety program for surface mobile equipment.&nbsp; Based on the Agency&rsquo;s experience, MSHA concluded that a mine operator with five or fewer miners would generally have a limited inventory of surface mobile equipment.&nbsp; These operators would also have less complex mining operations, with fewer mobile equipment hazards that would necessitate a written safety program.&nbsp; Thus, these mine operators are not required to have a written safety program, although MSHA would encourage operators with five or fewer miners to have safety programs.&nbsp; MSHA will consider comments and suggestions received on alternatives or best practices that all mines might use to develop safety programs (whether written or not) for surface mobile equipment.</p>
</body>
</html>]]></ALTERNATIVES>
            <COSTS_AND_BENEFITS><![CDATA[<!DOCTYPE html>
<html>
<head>
</head>
<body>
<p>The proposed rule would not be economically significant, and it would have some net benefits.</p>
</body>
</html>]]></COSTS_AND_BENEFITS>
            <RISKS><![CDATA[<!DOCTYPE html>
<html>
<head>
</head>
<body>
<p>Miners operating mobile and powered haulage equipment or working nearby face risks of workplace injuries, illnesses, or deaths.&nbsp; The proposed rule would allow a flexible approach to reducing hazards and risks specific to each mine so that mine operators would be able to develop and implement safety programs that work for their operation, mining conditions, and miners.&nbsp;</p>
</body>
</html>]]></RISKS>
        </RPLAN_INFO>
        <TIMETABLE_LIST>
            <TIMETABLE>
                <TTBL_ACTION>Request for Information (RFI)</TTBL_ACTION>
                <TTBL_DATE>06/26/2018</TTBL_DATE>
                <FR_CITATION>83 FR 29716</FR_CITATION>
            </TIMETABLE>
            <TIMETABLE>
                <TTBL_ACTION>Notice of Public Stakeholder Meetings</TTBL_ACTION>
                <TTBL_DATE>07/25/2018</TTBL_DATE>
                <FR_CITATION>83 FR 35157</FR_CITATION>
            </TIMETABLE>
            <TIMETABLE>
                <TTBL_ACTION>Stakeholder Meeting--Birmingham, AL</TTBL_ACTION>
                <TTBL_DATE>08/07/2018</TTBL_DATE>
            </TIMETABLE>
            <TIMETABLE>
                <TTBL_ACTION>Stakeholder Meeting--Dallas, TX</TTBL_ACTION>
                <TTBL_DATE>08/09/2018</TTBL_DATE>
            </TIMETABLE>
            <TIMETABLE>
                <TTBL_ACTION>Stakeholder Meeting (Webinar)--Arlington, VA</TTBL_ACTION>
                <TTBL_DATE>08/16/2018</TTBL_DATE>
            </TIMETABLE>
            <TIMETABLE>
                <TTBL_ACTION>Stakeholder Meeting--Reno, NV</TTBL_ACTION>
                <TTBL_DATE>08/21/2018</TTBL_DATE>
            </TIMETABLE>
            <TIMETABLE>
                <TTBL_ACTION>Stakeholder Meeting--Beckley, WV</TTBL_ACTION>
                <TTBL_DATE>09/11/2018</TTBL_DATE>
            </TIMETABLE>
            <TIMETABLE>
                <TTBL_ACTION>Stakeholder Meeting--Albany, NY</TTBL_ACTION>
                <TTBL_DATE>09/20/2018</TTBL_DATE>
            </TIMETABLE>
            <TIMETABLE>
                <TTBL_ACTION>Stakeholder Meeting--Arlington, VA</TTBL_ACTION>
                <TTBL_DATE>09/25/2018</TTBL_DATE>
            </TIMETABLE>
            <TIMETABLE>
                <TTBL_ACTION>RFI Comment Period End</TTBL_ACTION>
                <TTBL_DATE>12/24/2018</TTBL_DATE>
            </TIMETABLE>
            <TIMETABLE>
                <TTBL_ACTION>NPRM</TTBL_ACTION>
                <TTBL_DATE>09/09/2021</TTBL_DATE>
                <FR_CITATION>86 FR 50496</FR_CITATION>
            </TIMETABLE>
            <TIMETABLE>
                <TTBL_ACTION>NPRM Comment Period End</TTBL_ACTION>
                <TTBL_DATE>11/08/2021</TTBL_DATE>
            </TIMETABLE>
            <TIMETABLE>
                <TTBL_ACTION>NPRM Reopening of the Rulemaking Record for Public Comments</TTBL_ACTION>
                <TTBL_DATE>12/20/2021</TTBL_DATE>
                <FR_CITATION>86 FR 71860</FR_CITATION>
            </TIMETABLE>
            <TIMETABLE>
                <TTBL_ACTION>Virtual Public Hearing</TTBL_ACTION>
                <TTBL_DATE>01/11/2022</TTBL_DATE>
            </TIMETABLE>
            <TIMETABLE>
                <TTBL_ACTION>NPRM Comment Period Extension End</TTBL_ACTION>
                <TTBL_DATE>02/11/2022</TTBL_DATE>
            </TIMETABLE>
            <TIMETABLE>
                <TTBL_ACTION>Final Rule</TTBL_ACTION>
                <TTBL_DATE>07/00/2023</TTBL_DATE>
            </TIMETABLE>
        </TIMETABLE_LIST>
        <RFA_REQUIRED>No</RFA_REQUIRED>
        <SMALL_ENTITY_LIST>
            <SMALL_ENTITY>No</SMALL_ENTITY>
        </SMALL_ENTITY_LIST>
        <GOVT_LEVEL_LIST>
            <GOVT_LEVEL>None</GOVT_LEVEL>
        </GOVT_LEVEL_LIST>
        <FEDERALISM>No</FEDERALISM>
        <ENERGY_AFFECTED>No</ENERGY_AFFECTED>
        <PRINT_PAPER>No</PRINT_PAPER>
        <INTERNATIONAL_INTEREST>No</INTERNATIONAL_INTEREST>
        <AGENCY_CONTACT_LIST>
            <CONTACT>
                <FIRST_NAME>S. Aromie</FIRST_NAME>
                <LAST_NAME>Noe</LAST_NAME>
                <TITLE>Director, Office of Standards, Regulations, and Variances</TITLE>
                <AGENCY>
                    <CODE>1219</CODE>
                    <NAME>Mine Safety and Health Administration</NAME>
                    <ACRONYM>MSHA</ACRONYM>
                </AGENCY>
                <PHONE>202 693-9440</PHONE>
                <FAX>202 693-9441</FAX>
                <MAILING_ADDRESS>
                    <STREET_ADDRESS>201 12th Street S, Suite 401,</STREET_ADDRESS>
                    <CITY>Arlington</CITY>
                    <STATE>VA</STATE>
                    <ZIP>22202</ZIP>
                </MAILING_ADDRESS>
            </CONTACT>
        </AGENCY_CONTACT_LIST>
    </RIN_INFO>
</REGINFO_RIN_DATA>
