<?xml version="1.0" encoding="UTF-8" standalone="yes"?>
<REGINFO_RIN_DATA xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" RUN_DATE="2026-04-03-04:00" xsi:noNamespaceSchemaLocation="https://www.reginfo.gov/public/xml/REGINFO_XML_Ver10262011.xsd">
    <RIN_INFO>
        <RIN>1901-AB62</RIN>
        <PUBLICATION>
            <PUBLICATION_ID>202304</PUBLICATION_ID>
            <PUBLICATION_TITLE>Unified Agenda of Federal Regulatory and Deregulatory Actions</PUBLICATION_TITLE>
        </PUBLICATION>
        <AGENCY>
            <CODE>1901</CODE>
            <NAME>Departmental and Others</NAME>
            <ACRONYM>ENDEP</ACRONYM>
        </AGENCY>
        <PARENT_AGENCY>
            <CODE>1900</CODE>
            <NAME>Department of Energy</NAME>
            <ACRONYM>DOE</ACRONYM>
        </PARENT_AGENCY>
        <RULE_TITLE>Coordination of Federal Authorizations for Electric Transmission Facilities </RULE_TITLE>
        <ABSTRACT><![CDATA[<!DOCTYPE html>
<html>
<head>
</head>
<body>
<p>This rulemaking proposes to provide an updated process for the timely submission of information needed for Federal authorizations for proposed electric transmission facilities pursuant to section 216(h) of the Federal Power Act (FPA) (16 U.S.C. 824p(h)). It seeks to ensure electric transmission projects are developed consistent with the nation&rsquo;s environmental laws, including laws that protect endangered and threatened species, critical habitats, and historic properties. It provides a framework, called the Integrated Interagency Pre-Application (IIP) Process, by which the U.S. Department of Energy (DOE) will coordinate submission of materials necessary for federal authorizations and related environmental reviews required under Federal law to site qualified electric transmission facilities, and integrates that IIP Process into the Federal Electric Transmission Authorization Coordination Program.</p>
</body>
</html>]]></ABSTRACT>
        <PRIORITY_CATEGORY>Other Significant</PRIORITY_CATEGORY>
        <RIN_STATUS>First Time Published in The Unified Agenda</RIN_STATUS>
        <RULE_STAGE>Proposed Rule Stage</RULE_STAGE>
        <MAJOR>Undetermined</MAJOR>
        <UNFUNDED_MANDATE_LIST>
            <UNFUNDED_MANDATE>Undetermined</UNFUNDED_MANDATE>
        </UNFUNDED_MANDATE_LIST>
        <CFR_LIST>
            <CFR>10 CFR part 900</CFR>
        </CFR_LIST>
        <LEGAL_AUTHORITY_LIST>
            <LEGAL_AUTHORITY>16 U.S.C. 824p(h)</LEGAL_AUTHORITY>
        </LEGAL_AUTHORITY_LIST>
        <LEGAL_DLINE_LIST/>
        <RPLAN_ENTRY>No</RPLAN_ENTRY>
        <TIMETABLE_LIST>
            <TIMETABLE>
                <TTBL_ACTION>NPRM</TTBL_ACTION>
                <TTBL_DATE>08/00/2023</TTBL_DATE>
            </TIMETABLE>
        </TIMETABLE_LIST>
        <RFA_REQUIRED>Undetermined</RFA_REQUIRED>
        <GOVT_LEVEL_LIST>
            <GOVT_LEVEL>Undetermined</GOVT_LEVEL>
        </GOVT_LEVEL_LIST>
        <FEDERALISM>Undetermined</FEDERALISM>
        <PRINT_PAPER>No</PRINT_PAPER>
        <INTERNATIONAL_INTEREST>No</INTERNATIONAL_INTEREST>
        <AGENCY_CONTACT_LIST>
            <CONTACT>
                <FIRST_NAME>Gabriel</FIRST_NAME>
                <LAST_NAME>Daly</LAST_NAME>
                <AGENCY>
                    <CODE>1900</CODE>
                    <NAME>Department of Energy</NAME>
                    <ACRONYM>DOE</ACRONYM>
                </AGENCY>
                <PHONE>240 597-6973</PHONE>
                <EMAIL>gabriel.daly@hq.doe.gov </EMAIL>
                <MAILING_ADDRESS>
                    <STREET_ADDRESS>1000 Independence Avenue SW,</STREET_ADDRESS>
                    <CITY>Washington</CITY>
                    <STATE>DC</STATE>
                    <ZIP>20585</ZIP>
                </MAILING_ADDRESS>
            </CONTACT>
        </AGENCY_CONTACT_LIST>
    </RIN_INFO>
</REGINFO_RIN_DATA>
