RIN Data
| NRC | RIN: 3150-AI55 | Publication ID: Fall 2011 |
| Title: Decommissioning Planning [NRC-2008-0030] | |
| Abstract: The final rule amends the Commission's regulations to prevent future legacy sites. One set of changes revises 10 CFR 20.1406 and 20.1501 to require that licensees conduct their operations to minimize contamination at the site, including the subsurface, and to document survey results with records important for decommissioning. A second set of changes revises regulations in 10 CFR parts 30, 40, 50, 70, and 72 to provide tighter control of the decommissioning financial assurances and more detailed reporting by licensees of their decommissioning cost estimates. | |
| Agency: Nuclear Regulatory Commission(NRC) | Priority: Substantive, Nonsignificant |
| RIN Status: Previously published in the Unified Agenda | Agenda Stage of Rulemaking: Completed Actions |
| Major: No | Unfunded Mandates: No |
| CFR Citation: 10 CFR 20 10 CFR 30 10 CFR 40 10 CFR 50 10 CFR 70 10 CFR 72 | |
| Legal Authority: 42 USC 2201 42 USC 5841 | |
|
Legal Deadline:
None |
|||||||||||||||||||||
Timetable:
|
| Additional Information: This rule was previously RIN: 3150-AH45 which was completed in error in the previous cycle of the Unified Agenda. | |
| Regulatory Flexibility Analysis Required: No | Government Levels Affected: None |
| Small Entities Affected: No | |
| Included in the Regulatory Plan: No | |
| RIN Data Printed in the FR: No | |
| Related RINs: Related to 3150-AH45 | |
|
Agency Contact: Robert D. MacDougall Nuclear Regulatory Commission Office of Nuclear Material Safety and Safeguards, Washington, DC 20555-0001 Phone:301 415-5175 Email: robert.macdougall@nrc.gov |
|