View Rule

View EO 12866 Meetings Printer-Friendly Version     Download RIN Data in XML

DOD/COE RIN: 0710-AA60 Publication ID: Spring 2011 
Title: Nationwide Permit Program Regulations 
Abstract: The Corps proposed to revise its Nationwide Permit Program regulations at 33 CFR part 330 to address changes in regulatory procedures and policy that have occurred since those regulations were last revised in 1991. The Corps proposed to revise the regulation to increase the pre-construction notification review period to 45 days, to be consistent with the current nationwide permits. The Corps also proposed to amend the regulation to allow district engineers to issue verification letters that can have the same expiration date as the nationwide permit. 
Agency: Department of Defense(DOD)  Priority: Substantive, Nonsignificant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Final Rule Stage 
Major: Undetermined  Unfunded Mandates: No 
CFR Citation: 33 CFR 330   
Legal Authority: 33 USC 1344    33 USC 401 et seq    33 USC 1413   
Legal Deadline:  None
Timetable:
Action Date FR Cite
NPRM  11/30/2004  69 FR 69563   
NPRM Comment Period End  01/31/2005    
Final Action  06/00/2011    
Final Action Effective  08/00/2011    
Regulatory Flexibility Analysis Required: No  Government Levels Affected: Undetermined 
Small Entities Affected: No  Federalism: No 
Energy Effects: Statement of Energy Effects planned as required by Executive Order 13211.  Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
David B. Olson
Regulatory Program Manager
Department of Defense
U.S. Army Corps of Engineers
441 G Street NW, CECW-CO,
Washington, DC 20314-1000
Phone:202 761-4922
Email: david.b.olson@usace.army.mil