View Rule
View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
DOI/OSMRE | RIN: 1029-AC68 | Publication ID: Fall 2016 |
Title: Dam Safety | |
Abstract:
This rule would revise the Office of Surface Mining Reclamation and Enforcement's impoundment regulations to incorporate appropriate elements of the Federal Guidelines for Dam Safety (FGDS), including requirements for emergency action plans and after-action reports. The rule would implement two December 2012 recommendations from the Office of the Inspector General. Rulemaking is required to revise the CFR. |
|
Agency: Department of the Interior(DOI) | Priority: Substantive, Nonsignificant |
RIN Status: Previously published in the Unified Agenda | Agenda Stage of Rulemaking: Proposed Rule Stage |
Major: No | Unfunded Mandates: No |
CFR Citation: 30 CFR 816.49 30 CFR 817.49 | |
Legal Authority: 30 U.S.C. 1201 et seq. |
Legal Deadline:
None |
||||||
Timetable:
|
Regulatory Flexibility Analysis Required: No | Government Levels Affected: None |
Small Entities Affected: No | Federalism: No |
Included in the Regulatory Plan: No | |
RIN Data Printed in the FR: No | |
Agency Contact: Joshua Rockwell Mining Engineer Department of the Interior Office of Surface Mining Reclamation and Enforcement 1951 Constitution Avenue NW., Washington, DC 20240 Phone:202 208-2633 Email: jrockwell@osmre.gov |