View Rule

View EO 12866 Meetings Printer-Friendly Version     Download RIN Data in XML

DOE/EE RIN: 1904-AD71 Publication ID: Spring 2017 
Title: Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps 
Abstract:

This rulemaking pertaining to test procedures for Central Air Conditioners and Heat Pumps includes revisions to the test methods to improve test repeatability and reduce the test burden of the test procedure. These revisions will be required for demonstration of compliance with the current energy conservation standards starting 180 days after publication of the final rule. These amendments include: (1) establishing a delay time prior to off mode power measurements for some systems and limiting the internal volume of refrigerant pressure measurement lines; (2) requiring bin-by-bin EER and COP interpolations for all variable speed units; (3) requiring that the official test for a unit using the outdoor enthalpy method as a secondary check of capacity be the test without the outdoor enthalpy apparatus connected.

DOE is also amending the test procedure to improve field representativeness. These amendments will take effect coincident with updated energy conservation standards and would be part of a new Appendix M1. The new Appendix M1 includes: (1) new higher external static pressure requirements for all units, including unique minimum external static pressure requirements for certain kinds of products; (2) new default fan power values for rating coil-only units; revisions to the heating load line in the calculation of HSPF; and (3) amendments to the test procedures for variable speed heat pumps to allow better representation of their low-ambient-temperature performance, including an optional 5 °F heating mode test.

 
Agency: Department of Energy(DOE)  Priority: Substantive, Nonsignificant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Final Rule Stage 
Major: No  Unfunded Mandates: No 
CFR Citation: 10 CFR 430, Appendix M to subpart B     (To search for a specific CFR, visit the Code of Federal Regulations.)
Legal Authority: 42 USC 6291 et seq.   
Legal Deadline:  None
Timetable:
Action Date FR Cite
Supplemental NPRM  08/24/2016  81 FR 58164   
SNPRM Comment Period End  09/23/2016 
Final Rule  01/05/2017  82 FR 1426   
Final Rule Effective  07/08/2017 
Final Rule; Delay of Effective Date  02/02/2017  82 FR 8985   
Final Rule; Delay of Effective Date Effective  03/21/2017 
Final Rule; Further Delay of Effective Date  03/21/2017  82 FR 14425   
Final Rule; Further Delay of Effective Date Effective  07/03/2017 
Final Rule; Technical Correction  03/29/2017  82 FR 15457   
Regulatory Flexibility Analysis Required: Yes  Government Levels Affected: None 
Small Entities Affected: Businesses  Federalism: No 
Included in the Regulatory Plan: No 
RIN Information URL: www1.eere.energy.gov/buildings/appliance_standards/standards.aspx?productid=48&action=viewlive  
RIN Data Printed in the FR: Yes 
Agency Contact:
Ashley Armstrong
Director Regulatory Buildings, EE-5B
Department of Energy
Energy Efficiency and Renewable Energy
Building Technologies Office, 1000 Independence Avenue SW,
Washington, DC 20585
Phone:202 586-6590
Email: ashley.armstrong@ee.doe.gov