EPA/OAR | RIN: 2060-AT02 | Publication ID: Fall 2017 |
Title: National Emission Standards for Hazardous Air Pollutants for Source Categories: Generic Maximum Achievable Control Technology Standards--Ethylene Production (Subparts XX and YY) | |
Abstract:
This proposal will address the agency's residual risk and technology review (RTR) of the National Emission Standards for Hazardous Air Pollutants (NESHAP) for Ethylene Production. The Ethylene Production NESHAPs, subparts XX and YY, were promulgated pursuant to section 112(d) of the Clean Air Act (CAA) on July 12, 2002, and further amended on April 13, 2005. The NESHAP established emission limitations and work practice requirements based on maximum achievable control technology (MACT) for controlling emissions of hazardous air pollutants (HAP) from ethylene process vents, storage vessels, transfer racks, equipment, heat exchange systems and waste streams. The HAP emitted from ethylene process vents, storage vessels, transfer racks, equipment, heat exchange systems and waste streams include benzene, 1,3-butadiene, hexane, toluene and naphthalene. This action will implement the residual risk review requirements of CAA section 112(f)(2) and the technology review requirements of CAA section 112(d)(6). The statute directs the EPA to promulgate emission standards under CAA 112(f)(2) if such standards are required to provide an ample margin of safety to protect public health or to prevent, taking relevant factors into account, an adverse environmental effect. Any such standards are to be promulgated within eight years after promulgation of MACT standards under CAA section 112(d). CAA section 112(d)(6) requires the EPA to review and revise the MACT standards as necessary, taking into account developments in practices, processes and control technologies, no less often than every eight years. Pursuant to a court order, the EPA is obligated to complete the final action by March 13, 2020. In consideration of this deadline, which also applies to 19 other RTR source categories, we established an internal schedule for this RTR to be proposed and finalized prior to the consent decree deadline. |
|
Agency: Environmental Protection Agency(EPA) | Priority: Substantive, Nonsignificant |
RIN Status: Previously published in the Unified Agenda | Agenda Stage of Rulemaking: Proposed Rule Stage |
Major: Undetermined | Unfunded Mandates: Undetermined |
EO 13771 Designation: Other | |
CFR Citation: 40 CFR 63 | |
Legal Authority: 42 U.S.C. 7412 Clean Air Act |
Legal Deadline:
|
|||||||||
Timetable:
|
Additional Information: Docket #:EPA-HQ-OAR-2017-0357 | |
Regulatory Flexibility Analysis Required: No | Government Levels Affected: Undetermined |
Small Entities Affected: No | Federalism: No |
Included in the Regulatory Plan: No | |
Sectors Affected: 325110 Petrochemical Manufacturing | |
RIN Data Printed in the FR: No | |
Agency Contact: Andrew Bouchard Environmental Protection Agency Office of Air and Radiation 109 T.W. Alexander Drive, Mail Code E143-01, Research Triangle Park, NC 27709 Phone:919 541-4036 Email: bouchard.andrew@epa.gov Brenda Shine Environmental Protection Agency Office of Air and Radiation 109 T.W. Alexander Drive, Mail Code E143-01, Research Triangle Park, NC 27711 Phone:919 541-3608 Fax:919 541-0516 Email: shine.brenda@epa.gov |