Title: Advanced Power Reactor (APR)-1400 (KEPCO/KHNP) Design Certification [NRC-2015-0224] 
Abstract:

This rule would amend the Nuclear Regulatory Commission's regulations in 10 CFR part 52 by issuing a new appendix for the initial certification of the APR-1400 standard plant design (Korea Electric Power Corporation and Korea Hydro & Nuclear Power Co., Ltd). Applicants intending to construct and operate a nuclear power plant using the APR-1400 design may do so by referencing this design certification rule. Note that the final safety evaluation report serves as the regulatory basis for this rule. 

 
Agency: Nuclear Regulatory Commission(NRC)  Priority: Other Significant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Prerule Stage 
Major: No  Unfunded Mandates: No 
EO 13771 Designation: Independent agency 
CFR Citation: 10 CFR 52   
Legal Authority: 42 U.S.C. 2201    42 U.S.C. 5841   
Legal Deadline:  None
Timetable:
Action Date FR Cite
Regulatory Basis   06/00/2018 
NPRM  10/00/2018 
Final Rule  05/00/2019 
Additional Information: The NRC staff is developing the regulatory basis.
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Small Entities Affected: No  Federalism: No 
Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
Robert Beall
Nuclear Regulatory Commission
Office of Nuclear Material Safety and Safeguards,
Washington, DC 20555-0001
Phone:301 415-3874
Email: robert.beall@nrc.gov