View Rule

View EO 12866 Meetings Printer-Friendly Version     Download RIN Data in XML

DOE/EE RIN: 1904-AE24 Publication ID: Fall 2018 
Title: ●Amendments to Streamline the Test Procedure Interim Waiver Process  
Abstract:

The U.S. Department of Energy (DOE) is considering streamlining its test procedure waiver decision-making process to require the Department to notify, in writing, an applicant for an interim waiver of the disposition of the request within 30 business days of receipt of the application.  Should DOE fail to satisfy this requirement, the request for interim waiver would be deemed granted based on the criteria in DOE regulations specifying that DOE will grant an interim waiver if it determines that it is desirable for public policy reasons to grant immediate relief pending a determination of the petition for waiver.  An interim waiver would remain in effect until a waiver decision is published or until DOE publishes a new or amended test procedure that addresses the issues presented in the application, whichever is earlier. 

 
Agency: Department of Energy(DOE)  Priority: Substantive, Nonsignificant 
RIN Status: First time published in the Unified Agenda Agenda Stage of Rulemaking: Proposed Rule Stage 
Major: Undetermined  Unfunded Mandates: No 
EO 13771 Designation: Deregulatory 
CFR Citation: 10 CFR 430.27    10 CFR 431.401   
Legal Authority: 42 U.S.C. 6293    42 U.S.C. 6314   
Legal Deadline:  None
Timetable:
Action Date FR Cite
NPRM  12/00/2018 
Regulatory Flexibility Analysis Required: No  Government Levels Affected: Undetermined 
Small Entities Affected: No  Federalism: No 
Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
Elizabeth Kohl
Supervisory Attorney
Department of Energy
1000 Independence Avenue NW.,
Washington, DC 20585
Phone:202 586-7796
Email: elizabeth.kohl@hq.doe.gov