View Rule

View EO 12866 Meetings Printer-Friendly Version     Download RIN Data in XML

DOD/COE RIN: 0710-AA85 Publication ID: Spring 2019 
Title: Design Criteria for Dam and Lake Projects 
Abstract:

The existing regulation provides the design criteria for low level discharge facilities for drawdown of lakes to be impounded by Civil Works Projects, and is applicable to all USACE Divisions and Districts having responsibility for design of Civil Works projects. This final rule will remove unnecessary and duplicative regulatory text relating to matters also found in internal Agency guidance. The Corps does not expect the change to have any substantive impact on the public but removing the unnecessary regulatory text is expected to provide clarity and reduce confusion for the public. The internal guidance on which the Corps will rely in place of the regulatory text, and update as necessary, is Engineer Regulation 1110-2-240 and can be found at: https://www.publications.usace.army.mil/Portals/76/Publications/EngineerRegulations/ER_1110-2-240.pdf. This removal supports a recommendation of the DoD Regulatory Reform Task Force.

 
Agency: Department of Defense(DOD)  Priority: Substantive, Nonsignificant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Final Rule Stage 
Major: No  Unfunded Mandates: No 
EO 13771 Designation: Not subject to, not significant 
CFR Citation: 33 CFR 220   
Legal Authority: 49 Stat. 1571    33 U.S.C. 701c   
Legal Deadline:  None
Timetable:
Action Date FR Cite
Final Action  07/00/2019 
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Federalism: No 
Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
John Richard Calloway
Engineer
Department of Defense
U.S. Army Corps of Engineers
441 G Street NW, Attention: CECW-CE,
Washington, DC 20314
Phone:202 761-7500
Email: rick.calloway@usace.army.mil