View Rule

View EO 12866 Meetings Printer-Friendly Version     Download RIN Data in XML

DOD/COE RIN: 0710-AA96 Publication ID: Spring 2019 
Title: ●Flood Control Cost-Sharing Requirements Under the Ability to Pay Provision 
Abstract:

The U.S. Army Corps of Engineers (USACE) will amend this regulation because the 2000 Water Resources Development Act modified section 103(m) to include following mission areas: environmental protection and restoration, flood control, navigation, storm damage protection, shoreline erosion, hurricane protection, and recreation or an agricultural water supply project. It also included the opportunity to cost share all phases of a USACE project to include feasibility, design, and construction.

 
Agency: Department of Defense(DOD)  Priority: Other Significant 
RIN Status: First time published in the Unified Agenda Agenda Stage of Rulemaking: Final Rule Stage 
Major: No  Unfunded Mandates: Undetermined 
EO 13771 Designation: Deregulatory 
CFR Citation: 33 CFR 241   
Legal Authority: Pub. L. 99–662    33 U.S.C. 2201    Pub. L. 102–580   
Legal Deadline:  None
Timetable:
Action Date FR Cite
Interim Final Rule  09/00/2019 
Interim Final Rule Comment Period End  11/00/2019 
Interim Final Rule Effective  02/00/2020 
Regulatory Flexibility Analysis Required: Undetermined  Government Levels Affected: Undetermined 
Small Entities Affected: No  Federalism: Undetermined 
Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
Amy Frantz
Program Manager
Department of Defense
U.S. Army Corps of Engineers
CECW-P, 441 G Street NW,
Washington, DC 20314
Phone:202 761-0106
Email: amy.k.frantz@usace.army.mil