DOE/ENDEP | RIN: 1901-AB47 | Publication ID: Spring 2019 |
Title: Procedures for Permitting Electricity Transmission Facilities at International Boundaries | |
Abstract:
The rulemaking addresses Presidential action to permit the construction, connection, operation, and maintenance of facilities for the transmission of electric energy across international boundaries pursuant to Executive Order No. 10,485, as amended by Executive Order No. 12,038. The proposed procedures are intended to accommodate changes that have occurred in the electric power industry since the rule was last amended. |
|
Agency: Department of Energy(DOE) | Priority: Substantive, Nonsignificant |
RIN Status: Previously published in the Unified Agenda | Agenda Stage of Rulemaking: Proposed Rule Stage |
Major: No | Unfunded Mandates: No |
EO 13771 Designation: Deregulatory | |
CFR Citation: 10 CFR 205 | |
Legal Authority: 16 U.S.C. 824a(e) |
Legal Deadline:
None |
||||||
Timetable:
|
Regulatory Flexibility Analysis Required: Undetermined | Government Levels Affected: None |
Federalism: No | |
Included in the Regulatory Plan: No | |
RIN Data Printed in the FR: No | |
Agency Contact: Julie Smith Ph.D. Electricity Policy Analyst, OE-20 Department of Energy Office of Electricity Delivery and Energy Reliability, 1000 Independence Avenue SW, Washington, DC 20585 Phone:202 586-7668 Email: juliea.smith@hq.doe.gov |