View Rule
View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
DOE/EE | RIN: 1904-AE53 | Publication ID: Spring 2020 |
Title: Test Procedures for Commercial and Industrial Pumps | |
Abstract:
The Energy Policy and Conservation Act (EPCA), as amended, requires the U.S. Department of Energy (DOE) to amend test procedures with respect to commercial and industrial pumps at least once every 7 years, if it determines that amended test procedures would more accurately produce test results which measure energy efficiency, or make a determination not to amend test procedures. Once completed, this rulemaking will fulfill DOE’s statutory obligation to either propose amended test procedures for this equipment or determine that the existing test procedures do not need to be amended. |
|
Agency: Department of Energy(DOE) | Priority: Substantive, Nonsignificant |
RIN Status: Previously published in the Unified Agenda | Agenda Stage of Rulemaking: Prerule Stage |
Major: No | Unfunded Mandates: Undetermined |
EO 13771 Designation: Other | |
CFR Citation: 10 CFR 431.464 | |
Legal Authority: 42 U.S.C. 6311(1)(A) 42 U.S.C. 6293(b)(1) |
Legal Deadline:
|
||||||||
Timetable:
|
Regulatory Flexibility Analysis Required: Undetermined | Government Levels Affected: Undetermined |
Federalism: Undetermined | |
Included in the Regulatory Plan: No | |
RIN Information URL: https://www1.eere.energy.gov/buildings/appliance_standards/standards.aspx?productid=41&action=viewlive | |
RIN Data Printed in the FR: No | |
Agency Contact: Jeremy Dommu Building Technologies Office, EE-2J Department of Energy 1000 Independence Avenue SW, Washington, DC 20585 Phone:202 586-9870 Email: jeremy.dommu@ee.doe.gov |