Title: Prevention of Significant Deterioration (PSD) and Nonattainment New Source Review (NSR): Project Emissions Accounting 
Abstract:

The Environmental Protection Agency (EPA) is promulgating revisions to its major New Source Review (NSR) applicability regulations to clarify when the requirement to obtain a major NSR permit applies to a source proposing to undertake a physical change or a change in the method of operation (i.e., a project) under the major NSR preconstruction permitting programs. Under these programs, an existing major stationary source proposing to undertake a project must determine whether that project will constitute a major modification subject to the major NSR preconstruction permitting requirements by following a two-step applicability test. The first step is to determine if the proposed project would result in a "significant emissions increase" of a regulated NSR pollutant (Step 1). If the proposed project is determined to result in such an increase, the second step is to determine if the project would also result in a "significant net emissions increase" of that pollutant from the source (Step 2). In this action, we are promulgating revisions to our major NSR applicability regulations to clarify that both increases and decreases in emissions resulting from a proposed project can be considered in Step 1 of the major NSR major modification applicability test. We refer to the consideration of emissions increases and decreases in Step 1 as project emissions accounting.

 
Agency: Environmental Protection Agency(EPA)  Priority: Other Significant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Completed Actions 
Major: No  Unfunded Mandates: No 
EO 13771 Designation: Deregulatory 
CFR Citation: 40 CFR 51 40 CFR 52   
Legal Authority: 42 U.S.C. 7401 et seq.   
Legal Deadline:  None
Timetable:
Action Date FR Cite
NPRM  08/09/2019  84 FR 39244   
Final Rule  11/24/2020  85 FR 74890   
Final Rule Effective  11/24/2020 
Additional Information: Docket #:EPA-HQ-OAR-2018-0048
Regulatory Flexibility Analysis Required: No  Government Levels Affected: Federal, Local, State 
Small Entities Affected: No  Federalism: No 
Included in the Regulatory Plan: No 
RIN Information URL: https://www.epa.gov/nsr  
RIN Data Printed in the FR: No 
Agency Contact:
Jessica Montanez
Environmental Protection Agency
Office of Air and Radiation
C504-03,
Research Triangle Park, NC 27711
Phone:919 541-3407
Fax:919 541-5509
Email: montanez.jessica@epa.gov

Raj Rao
Environmental Protection Agency
Office of Air and Radiation
C504-03,
Research Triangle Park, NC 27711
Phone:919 541-5344
Fax:919 541-5509
Email: rao.raj@epa.gov