View Rule
View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
DOD/COE | RIN: 0710-AB34 | Publication ID: Spring 2021 |
Title: ●Flood Control Cost-Sharing Requirements Under the Ability to Pay Provision | |
Abstract:
Section 103(m) of the Water Resources Development Act (WRDA) of 1986, as amended (33 U.S.C. 2213(m)), authorizes the US Army Corps of Engineers (Corps) to reduce the non-Federal share of the cost of a study or project for certain communities that are not able financially to afford the standard cost-share. Part 241 of 33 CFR provides the criteria that the Corps uses in making these determinations where the primary purpose of the study or project is flood damage reduction. The proposed rule would update this regulation, including by broadening the project purposes for which the Corps could reduce the non-Federal cost-share on this basis. |
|
Agency: Department of Defense(DOD) | Priority: Other Significant |
RIN Status: First time published in the Unified Agenda | Agenda Stage of Rulemaking: Proposed Rule Stage |
Major: Undetermined | Unfunded Mandates: Undetermined |
CFR Citation: 33 CFR 241 | |
Legal Authority: 33 U.S.C. 2213(m) |
Legal Deadline:
None |
||||||
Timetable:
|
Regulatory Flexibility Analysis Required: Undetermined | Government Levels Affected: None |
Small Entities Affected: No | Federalism: No |
Included in the Regulatory Plan: No | |
RIN Data Printed in the FR: No | |
Related RINs: Previously reported as 0710-AA91 | |
Agency Contact: Amy Frantz Program Manager Department of Defense U.S. Army Corps of Engineers CECW-P, 441 G Street NW, Washington, DC 20314 Phone:202 761-0106 Email: amy.k.frantz@usace.army.mil |