View Rule
View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
DOE/ENDEP | RIN: 1901-AB47 | Publication ID: Fall 2022 |
Title: Procedures for Permitting Electricity Transmission Facilities at International Boundaries | |
Abstract:
This rulemaking addresses Presidential action to permit the construction, connection, operation, and maintenance of facilities for the transmission of electric energy across international boundaries pursuant to Executive Order 10485, as amended by Executive Order 12038. The proposed amendments are intended to accommodate changes that have occurred in the electric power industry since the rule was last amended on December 31, 1981, at 46 FR 63209. Previously, the rule was amended on October 28, 1980 at 45 FR 71560. The changes that have occurred in the electric power industry include bulk-power market restructuring and the rise of Regional Transmission Organizations/Independent System Operators. |
|
Agency: Department of Energy(DOE) | Priority: Substantive, Nonsignificant |
RIN Status: Previously published in the Unified Agenda | Agenda Stage of Rulemaking: Long-Term Actions |
Major: No | Unfunded Mandates: No |
CFR Citation: 10 CFR 205 | |
Legal Authority: E.O. 10485 (Sept. 3, 1953), as amended by E.O. 12038 (Feb. 3, 1978) |
Legal Deadline:
None |
||||||
Timetable:
|
Regulatory Flexibility Analysis Required: Undetermined | Government Levels Affected: None |
Federalism: No | |
Included in the Regulatory Plan: No | |
RIN Data Printed in the FR: No | |
Agency Contact: Michelle Manary Department of Energy Bonneville Power Administration, 905 NE 11 Avenue , Portland, OR 97232 Phone:503 230-5858 Email: michelle.manary@hq.doe.gov |