Title: ●Transmission System Planning Performance Requirements for Extreme Weather 
Abstract:

The Commission proposed to direct that the North American Electric Reliability Corporation, the Commission-certified Electric Reliability Organization, submit to the Commission modifications to Reliability Standard TPL-001-5.1 (Transmission System Planning Performance Requirements) within one year of the effective date of a final rule in this proceeding to address reliability concerns pertaining to transmission system planning for extreme heat and cold weather events that impact the reliable operations of the Bulk-Power System. Specifically, we proposed to direct NERC to develop modifications to Reliability Standard TPL-001-5.1 to require: development of benchmark planning cases based on information such as major prior extreme heat and cold weather events or future meteorological projections; planning for extreme heat and cold events using steady state and transient stability analyses expanded to cover a range of extreme weather scenarios including the expected resource mix’s availability during extreme weather conditions, and including the broad area impacts of extreme weather; and corrective action plans that include mitigation for any instances where performance requirements for extreme heat and cold events are not met (Docket No. RM22-10-000).

 
Agency: Federal Energy Regulatory Commission(FERC)  Priority: Substantive, Nonsignificant 
RIN Status: First time published in the Unified Agenda Agenda Stage of Rulemaking: Proposed Rule Stage 
Major: No  Unfunded Mandates: No 
CFR Citation: 18 CFR 40   
Legal Authority: 16 U.S.C. 824o   
Legal Deadline:  None
Timetable:
Action Date FR Cite
NPRM  06/27/2022  87 FR 38020   
NPRM Comment Period End  08/26/2022 
Next Action Undetermined  11/00/2023 
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
Leigh Anne Faugust
Legal Information, Office of the General Counsel
Federal Energy Regulatory Commission
888 First Street NE,
Washington, DC 20426
Phone:202 502-6396
Email: leigh.faugust@ferc.gov

Mahmood Mirheydar
Technical Information, Office of Electric Reliability
Federal Energy Regulatory Commission
888 First Street NE,
Washington, DC 20426
Phone:202 502-8034
Email: mahmood.mirheydar@ferc.gov