View Rule

View EO 12866 Meetings Printer-Friendly Version     Download RIN Data in XML

EPA/OAR RIN: 2060-AV59 Publication ID: Fall 2022 
Title: National Emission Standards for Hazardous Air Pollutants: Lime Manufacturing Plants; Amendments  
Abstract:

This action addresses amendments to the National Emission Standards for Hazardous Air Pollutants (NESHAP) for Lime Manufacturing as a result of the D.C. Circuit’s opinion in Louisiana Environmental Action Network v. EPA, 955 F.3d 1088 (D.C. Cir. 2020) (“LEAN”). The Lime Manufacturing NESHAP, codified in 40 CFR part 63, subpart AAAAA, was promulgated pursuant to section 112(d) of the Clean Air Act (CAA) on January 5, 2004. The residual risk and technology review (RTR) was promulgated pursuant to CAA 112(f) and 112(d)(6) on July 24, 2020. The NESHAP established emission limitations and work practice requirements based on maximum achievable control technology for control of hazardous air pollutants (HAP) from kilns at new and existing lime manufacturing plants. The pollutants emitted from lime manufacturing kilns include metallic HAP, hydrogen chloride, particulate matter, sulfur dioxide, nitrogen oxides and carbon dioxide. The court in LEAN held that EPA must set limits on uncontrolled hazardous air pollutant emissions when it conducts technology reviews under section 112(d)(6) of the CAA, 42 U.S.C. section 7412(d)(6). Pursuant to the D.C. District Court’s April 15, 2021, order in Blue Ridge Environmental Defense League v. Regan, Case No: 1:16-cv-00364-CRC (D.D.C. filed Feb. 24, 2016) related to the extension of EPA’s deadline for final action of five source categories, the EPA must complete the final action for the Lime Manufacturing NESHAP by February 23, 2023.

 
Agency: Environmental Protection Agency(EPA)  Priority: Other Significant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Proposed Rule Stage 
Major: No  Unfunded Mandates: No 
CFR Citation: 40 CFR 63, subpart AAAAA     (To search for a specific CFR, visit the Code of Federal Regulations.)
Legal Authority: 42 U.S.C. 7401 et seq. Clean Air Act    42 U.S.C. 7414 and 7601   
Legal Deadline:
Action Source Description Date
Final  Judicial  Court-ordered deadline of 2/23/2023.  02/23/2023 
Timetable:
Action Date FR Cite
NPRM  12/00/2022 
Final Rule  02/00/2023 
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Small Entities Affected: No  Federalism: No 
Included in the Regulatory Plan: No 
Sectors Affected: 32741 Lime Manufacturing; 327410 Lime Manufacturing; 33111 Iron and Steel Mills and Ferroalloy Manufacturing 
RIN Data Printed in the FR: No 
Agency Contact:
Brian Storey
Environmental Protection Agency
Office of Air and Radiation
109 T.W. Alexander Drive, Mail Code D243-04,
Research Triangle Park, NC 27711
Phone:919 541-1103
Fax:919 541-4991
Email: storey.brian@epa.gov

Keith Barnett
Environmental Protection Agency
Office of Air and Radiation
D243-04,
Research Triangle Park, NC 27711
Phone:919 541-5605
Fax:919 541-4991
Email: barnett.keith@epa.gov