View Rule
View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
FERC | RIN: 1902-AG07 | Publication ID: Spring 2023 |
Title: ●Reliability Standards to Address Inverter-Based Resources | |
Abstract:
The Commission proposed to direct the North American Electric Reliability Corporation (NERC), the Commission-certified Electric Reliability Organization (ERO), to develop new or modified Reliability Standards that address the following reliability gaps related to inverter-based resources (IBR): data sharing; model validation; planning and operational studies; and performance requirements. Further, the Commission proposed to direct NERC to submit to the Commission a compliance filing within 90 days of the effective date of the final rule in this proceeding that included a detailed, comprehensive standards development and implementation plan to ensure all new or modified Reliability Standards necessary to address the IBR-related reliability gaps identified in the final rule are submitted to the Commission within 36 months of Commission approval of the plan (Docket No. RM22-12-000). |
|
Agency: Federal Energy Regulatory Commission(FERC) | Priority: Substantive, Nonsignificant |
RIN Status: First time published in the Unified Agenda | Agenda Stage of Rulemaking: Proposed Rule Stage |
Major: No | Unfunded Mandates: No |
CFR Citation: 18 CFR 40 | |
Legal Authority: 16 U.S.C. 824o |
Legal Deadline:
None |
|||||||||||||||
Timetable:
|
Regulatory Flexibility Analysis Required: No | Government Levels Affected: None |
Included in the Regulatory Plan: No | |
RIN Data Printed in the FR: No | |
Agency Contact: Alan Rukin Legal Information, Office of the General Counsel Federal Energy Regulatory Commission 888 First Street NE, Washington, DC 20426 Phone:202 502-8502 Email: alan.rukin@ferc.gov Eugene Blick Technical Information, Office of Electric Reliability Federal Energy Regulatory Commission 888 First Street NE, Washington, DC 20426 Phone:202 502-8803 Email: eugene.blick@ferc.gov |