View Rule

View EO 12866 Meetings Printer-Friendly Version     Download RIN Data in XML

DOE/EE RIN: 1904-AF32 Publication ID: Spring 2023 
Title: Energy Conservation Standards for 3-Phase, Small Commercial Package Air Conditioning and Heating Equipment With a Cooling Capacity of Less Than 65,000 Btu/h 
Abstract:

Consistent with the requirements under the Energy Policy and Conservation Act (EPCA), as amended, the Department of Energy (DOE) is examining whether to amend the current energy conservation standards for certain categories of Commercial Air Conditioning and Heating Equipment found at 10 CFR 431.97. As a result of this effort, DOE may either propose and adopt: (1) the amended ASHRAE standard 90.1-2019 levels; or (2) more-stringent standards if supported by "clear and convincing" evidence. DOE has proposed amended energy conservation standards that rely on new efficiency metrics and align with the amended efficiency levels in the industry standard, ASHRAE 90.1-2019. DOE has preliminarily determined that it lacks clear and convincing evidence required by the EPCA to adopt standards more stringent than the levels specified in the industry standard. DOE has also proposed definitions for space-constrained commercial package air conditioning and heating equipment and for small-duct, high-velocity commercial package air conditioning and heating equipment.

 
Agency: Department of Energy(DOE)  Priority: Substantive, Nonsignificant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Final Rule Stage 
Major: Undetermined  Unfunded Mandates: Undetermined 
CFR Citation: 10 CFR 431   
Legal Authority: 42 U.S.C. 6313(a)(6)(A)    42 U.S.C. 6313(a)(6)(C)(i)   
Legal Deadline:
Action Source Description Date
Other  Statutory  Subject to ASHRAE trigger for certain equipment in 42 U.S.C. 6313(a)(6)(A)   
Other  Statutory  Subject to 6-year-look-back in 42 U.S.C. 6313(a)(6)(C)   
Timetable:
Action Date FR Cite
Notification of Data Availability (NODA)  09/25/2020  85 FR 60642   
NODA Comment Period End  11/09/2020 
Notice of Proposed Rulemaking (NPRM)  03/30/2022  87 FR 18290   
NPRM Comment Period End  05/31/2022 
Final Action  06/00/2023 
Regulatory Flexibility Analysis Required: Undetermined  Government Levels Affected: None 
Federalism: No 
Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
Catherine Rivest
General Engineer
Department of Energy
Energy Efficiency and Renewable Energy
1000 Independence Avenue SW, Building Technologies Office, EE-5B,
Washington, DC 20585
Phone:202 586-7335
Email: catherine.rivest@ee.doe.gov