View Rule

View EO 12866 Meetings Printer-Friendly Version     Download RIN Data in XML

DOE/EE RIN: 1904-AE95 Publication ID: Spring 2024 
Title: Test Procedures for Dedicated-Purpose Pool Pumps 
Abstract:

The U.S. Department of Energy (DOE) initiated an effort to determine whether to amend the test procedures for dedicated-purpose pool pumps (DPPPs). The Energy Policy and Conservation Act (EPCA), as amended, requires DOE to amend test procedures with respect to dedicated-purpose pool pumps at least once every 7 years, if it determines that amended test procedures would more accurately produce test results which measure energy efficiency, or make a determination not to amend test procedures. DOE proposes to amend the test procedures for DPPPs to incorporate by reference the latest version of the relevant industry standards, to codify DOE’s current enforcement policy regarding the scope of the DPPP test procedure pertaining to DPPPs that cannot be appropriately tested by the current DOE test procedure, to align DOE’s DPPP definitions with DOE’s corresponding DPPP motor definitions, and to remove an obsolete DOE DPPP test procedure appendix. Once completed, this rulemaking will fulfill DOE’s statutory obligation to either propose amended test procedures for this equipment or determine that the existing test procedures do not need to be amended.

 
Agency: Department of Energy(DOE)  Priority: Substantive, Nonsignificant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Final Rule Stage 
Major: Undetermined  Unfunded Mandates: No 
CFR Citation: 10 CFR 431, App. B and C to subpart Y     (To search for a specific CFR, visit the Code of Federal Regulations.)
Legal Authority: 42 U.S.C. 6314 (a)(1)(A)    42 U.S.C. 6311(1)(A)   
Legal Deadline:
Action Source Description Date
Other  Statutory  Subject to 7-year-look-back in 42 U.S.C. 6314(a)(1)(A)   
Timetable:
Action Date FR Cite
Request for Information (RFI); Early Assessment Review  01/24/2022  87 FR 3457   
RFI Comment Period End  02/23/2022 
RFI Comment Period Reopened  02/25/2022  87 FR 10751   
RFI Comment Period Reopened End  03/09/2022 
NPRM  12/02/2022  87 FR 74023   
NPRM Comment Period End  01/31/2023 
Final Action  07/00/2024 
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Federalism: No 
Included in the Regulatory Plan: No 
RIN Information URL: https://www1.eere.energy.gov/buildings/appliance_standards/standards.aspx?productid=67  
RIN Data Printed in the FR: No 
Agency Contact:
Jeremy Dommu
Building Technologies Office, EE-2J
Department of Energy
1000 Independence Avenue SW,
Washington, DC 20585
Phone:202 586-9870
Email: jeremy.dommu@ee.doe.gov