View Rule
| View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
| DOE/ENDEP | RIN: 1901-AB68 | Publication ID: Spring 2025 |
| Title: ●Application for Presidential Permit Authorizing the Construction, Connection, Operation, and Maintenance of Facilities for Transmission of Electric Energy at International Boundaries | |
|
Abstract:
This action proposes to rescind in its entirety regulations providing a list of what is required in applications for a presidential permit authorizing construction, connection, operation, and maintenance of facilities for transmission of electric energy at international boundaries. Among other things, this list includes timing requirements, application requirements, transfer restrictions, reporting requirements and NEPA requirements. |
|
| Agency: Department of Energy(DOE) | Priority: Other Significant |
| RIN Status: First time published in the Unified Agenda | Agenda Stage of Rulemaking: Final Rule Stage |
| Major: Undetermined | Unfunded Mandates: Undetermined |
| EO 14192 Designation: Deregulatory | |
| CFR Citation: 10 CFR 205.320-329 | |
| Legal Authority: EO 10485 as amended by EO 12038 | |
|
Legal Deadline:
None |
|||||||||
Timetable:
|
| Regulatory Flexibility Analysis Required: Undetermined | Government Levels Affected: Undetermined |
| Federalism: Undetermined | |
| Included in the Regulatory Plan: No | |
| RIN Data Printed in the FR: No | |
|
Agency Contact: David Taggart Acting General Counsel Department of Energy Office of General Counsel 1000 Independence Ave, SW, Office of the General Counsel, Washington, DC 20585 Phone:202 586-5281 Email: doegeneralcounsel@hq.doe.gov |
|
An official website of the United States government



