View Rule

View EO 12866 Meetings Printer-Friendly Version     Download RIN Data in XML

DOE/EE RIN: 1904-AF49 Publication ID: Spring 2025 
Title: Test Procedures for Central Air Conditioners and Heat Pumps 
Abstract:

The U.S. Department of Energy (DOE) is undertaking this rulemaking to satisfy the statutory requirement that, at least once every 7 years, DOE evaluate test procedures for each type of covered product, including central air conditioners and heat pumps, to determine whether amended test procedures would more accurately or fully comply with the requirements for the test procedures to not be unduly burdensome to conduct and be reasonably designed to produce test results that reflect energy efficiency, energy use, and estimated operating costs during a representative average use cycle or period of use.  (42 U.S.C. 6293(b)(1)(A))

The final rule amends the Federal test procedure for central air conditioners and heat pumps (CAC/ HPs) to incorporate by reference the latest versions of the applicable industry standards. Specifically, DOE is incorporating by reference the latest version of the relevant industry consensus test standard, AHRI 210/2402024 (IP) for the current test procedure for CAC/HPs (appendix M1) for measuring the current cooling and heating metrics seasonal energy efficiency ratio 2 (SEER2) and heating seasonal performance factor 2 (HSPF2). DOE is incorporating by reference the new industry consensus test standard, AHRI 16002024 (IP), for a new test procedure (appendix M2) for CAC/HPs that adopts two new metrics seasonal cooling and off-mode rating efficiency (SCORE) and seasonal heating and off-mode rating efficiency (SHORE). Testing to the SCORE and SHORE metrics would not be required until such time as compliance is required with any amended energy conservation standard based on the new metrics. Additionally, the final rule amends certain provisions of DOE’s regulations related to representations and enforcement for CAC/HPs.

 

 
Agency: Department of Energy(DOE)  Priority: Substantive, Nonsignificant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Final Rule Stage 
Major: No  Unfunded Mandates: No 
EO 14192 Designation: Not subject to, not significant 
CFR Citation: 10 CFR 430, subpart B, App. M1     (To search for a specific CFR, visit the Code of Federal Regulations.)
Legal Authority: 42 U.S.C. 6293(b)(1)(A)   
Legal Deadline:
Action Source Description Date
Final  Statutory  Subject to 7-year-look-back in 42 U.S.C. 6293(b)  01/05/2024 
Timetable:
Action Date FR Cite
Request for Information (RFI)  01/24/2023  88 FR 4091   
RFI Comment Period End  02/23/2023 
NPRM  04/05/2024  89 FR 24206   
NPRM Comment Period End  06/06/2024 
Final Rule  01/07/2025  90 FR 1224   
Final Rule; Delay in Effective Date  02/05/2025  90 FR 9001   
Final rule; Delay of Effective Date  03/20/2025  90 FR 13052   
Final Rule; Further Delay of Effective Date  05/20/2025  90 FR 21389   
Final Rule Effective  07/07/2025 
NPRM  05/29/2025  90 FR 22671   
NPRM Comment Period End  06/30/2025 
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Federalism: No 
Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
Lucas Adin
Project Manager
Department of Energy
Energy Efficiency and Renewable Energy
1000 Independence Avenue SW, Mail Stop EE-5B,
Washington, DC 20585
Phone:202 287-5904
Email: lucas.adin@ee.doe.gov