View EO 12866 Meeting 2137-AF06

  Pipeline Safety: Amendments to Parts 192 and 195 to require Valve installation and Minimum Rupture Detection Standards

  2137-DOT/PHMSA

  Final Rule Stage

  01/20/2022 02:00 PM

  Babst Calland   Keith Coyle   GPA Midstream Association


 
List of Documents
No documents found.
 
List of Attendees Participation
•   Mr. Matthew Hite  - GPA Mid Stream Teleconference 
•   Joe Nye  - OMB/OIRA Teleconference 
•   Sean Ford  - DOT/PHMSA Teleconference 
•   John Gale  - DOT/PHMSA Teleconference 
•   Keith Coyle  - Babst Calland Teleconference 
•   Mary Fitzpatrick  - OMB/OIRA Teleconference 
•   Rob Ross  - DOT/PHMSA Teleconference