Information Collection List

IC Title Status Responses Hours Dollars Document Type Form No. Form Name
250.107(c)(3) - BAST Removed 0 0 0
250.800(a); 880(a)(1), (2) - Request Approval New 41 41 0
250.801(c) - Request evaluation New 1 24 0
250.801(c); 802(c)(1) - 3rd Party Costs for Review New 3 0 90000
250.802(c)(1) - Maintain description of Process New 250 250 0
250.802(c)(5), (e) - Document and Retain SPPE New 30 60 0
250.803(a), (d) - Written notice of Equipment Failure New 10 30 0
250.803(b), (d) - Document/Determine the results of SPPE failure New 10 50 0
250.803(c), (d) - Submit Modified Procedures New 1 2 0
250.810-869 - Surface and Subsurface Safety Systems - Dry Trees Removed 0 0 0
250.810; 816; 830 - Submit request / incapable of nature flow New 15 165 0
250.810; 816; 830 - Verify no-flow condition New 15 15 0
250.814(a); 815(b); 828(a); 829(b) - Request Approval for setting depth when conditions warrant New 1 1 0
250.831 - Submit Repair/Replacement plan New 2 4 0
250.831-874 - Subsea and Subsurface Safety Systems - Subsea Trees Removed 0 0 0
250.831; 833(a), (b); 837(c)(5); 838(c); 874(g)(2), (h)(1) - Various Notifications New 125 125 0
250.837(a) - Request Approval to not shut-down New 1 1 0
250.837(b)(2); (c)(2) - Obtain approval to resume production New 2 1 0
250.838(a)(2); 839(a)(2) - Verify closure time New 2 4 0
250.838(c)(3) - Request approval produce after loss of comm. New 2 4 0
250.841(b) - Request approval of temporary repairs New 810 1620 0
250.842 - Submit Application - 25-125 components New 1 21 30598
250.842 - Submit Application - < 25 components New 5 55 22230
250.842 - Submit Application - >125 components New 2 60 114968
250.842 - Submit Modification - 25-125 components New 220 2200 1717100
250.842 - Submit Modification - < 25 components New 70 490 139230
250.842 - Submit Modification - > 125 components New 236 5192 3724316
250.842(c) - Hazard Analysis New 32 192 0
250.842(d) - Certification Letter New 32 208 0
250.842(e) - Maintain design & installation records New 32 32 0
250.851(a)(2) - Request Approval / Uncoded pressure vessels New 1 2 0
250.851(b); 852(a)(2), (3); 858(b); 865(b) - Maintain pressure-recorder info. New 658 23030 0
250.851(c)(2) - Request approval - less than 5 psi New 10 10 0
250.852(c)(1) - Request Approval to vent other location New 10 10 0
250.852(c)(2) - PSV New 3 3 0
250.852(e)(1) - Review DMV Report New 10 10 0
250.855(a) - Identify all EDS stations New 2 16 0
250.855(b) - Maintain ESD schematic listing New 650 11700 0
250.858(a)(3) - Request Approval to use different procedure New 1 1 0
250.859(a)(3), (4) - Post Diagram of firefighting system New 10 80 0
250.859(c); 860(b), (c); related NTL(s) - Request Approval / chemical only fire New 50 1950 0
250.860(d) - Changes made after approval New 14 7 0
250.861(b) - Annual Inspection of foam concentrates New 500 1000 209000
250.864 - Maintain erosion records New 645 13545 0
250.867(a) - Request Approval safety system/device New 20 140 0
250.867(b) - Submit temp firewater supporting info. New 5 5 0
250.867(c) - Request approval temp equipment New 100 300 0
250.870(a) - Document PSL New 6 3 0
250.874(g)(3) - Submit subsea shutdown capability New 5 10 0
250.874(h)(2) - Request approval to inject New 5 5 0
250.876 - Doc & Retain 5 yrs tube-type heater New 300 300 4500000
250.880(a)(3) - Notify prior to performing modifications New 20 10 0
250.880(d)(1) - Request approval to exceed > 24 months New 20 20 0
250.890(a), (b) - Maintain SSS records 5 yrs New 658 31584 0
250.890(c) - Submit contact list or revised New 1800 900 0
30 CFR 250.800-880 - General Removed 0 0 0
30 CFR 250.842- Production Safety Systems Removed 0 0 0
30 CFR 250.851-876 Additional Production System Requirements Removed 0 0 0
30 CFR 250.880 - Safety Device Testing Removed 0 0 0
30 CFR 250.890 - Records and Training Removed 0 0 0
Total burden requested under this ICR: 7454 95488 10547442  
To view an IC, click on IC Title