Information Collection List

IC Title Status Responses Hours Dollars Document Type Form No. Form Name
250.1618(a), (b), (c) - Changes to Plans (Sulfur) Removed 0 0 0
250.1619(b) - Suspension/Temporary Prohibition (Sulfur) Removed 0 0 0
250.1622(a), (b) - Approval for Operations (Sulfur) Removed 0 0 0
250.1622(c)(2) - Well Tests Results (Sulfur) Removed 0 0 0
250.1704 - Well Abandonment Modified 604 2567 0
250.1704(g) - Final Well Schematic Removed 0 0 0
250.1704(h)-Submit with a final well schematic, description, nature and quantities of material used New 368 1152 0
250.1712; 1704(h) - Permanently Plugging - Certification Modified 215 1129 0
250.1712; 1704(h) - Permanently Plugging - Descriptions Modified 375 1031 0
250.1721; 1704(h) - Application to Temp. Abandon Modified 1094 5744 0
250.1722(a) - Approval Modified 15 19 0
250.1723(b) - Request Removal Modified 138 242 0
250.1743(a) - Signed Certification Modified 5 18 0
250.300(b)(1), (2) - Petroleum-based substance Removed 0 0 0
250.471(c) - SCCE Removed 0 0 0
250.471(c), 250.470(f), 250.465(a) - Re-Evaluation of SCCE Removed 0 0 0
250.513 - Well-Completion Operations Modified 150 150 0
250.518(f) - Production Packer Setting Depth Modified 43 97 0
250.526(a) - Corrective Action Modified 58 0 0
250.613(a), (b) - Other than Normal Workover Modified 687 3607 0
250.613(c) - New Zone Modified 167 418 0
250.613(d) - Work as Performed Modified 646 1292 0
250.619(f) - Production Packer Setting Depth Modified 43 59 0
250.701 - Proposed Alternate Procedures Modified 67 218 0
250.702 - Identify Departures Modified 47 82 0
250.713 - MODU Modified 180 270 0
250.720(b) - Displace Kill Weight Fluid Modified 129 194 0
250.721(g) - Successful Negative Pressure Test Modified 325 325 0
250.731 - BOP System Modified 170 850 5270000
250.732(b) and (c) - Submit independent third party qualifications to BSEE with the associated permit application. New 1471 6252 0
250.733 - Annulus Monitoring Plan Modified 212 106 0
250.737(d)(12) - Autoshear/Deadman event Modified 223 223 0
250.737(d)(2) - Initial Test Modified 41 21 0
250.737(d)(3) - Stump Test Modified 39 20 0
250.737(d)(4) - Initial Subsea BOP Modified 41 21 0
250.738(m) - BAVO report Modified 266 532 0
250.738(n) - Pipe/Variable Bore Rams Modified 223 167 0
250.750(a) - Operations w/out down-hole check valves Modified 640 960 0
250.801(h) - Safety Device Removed 0 0 0
250.804(a) - SSSVs Removed 0 0 0
250.813-May submit an APM for approval to equip a dry tree well New 1 0 0
250.817(a)-remove a wireline subsurface safety device New 1 0 0
250.828(b)-Well must not be open to flow SSSV is inoperable New 1 0 0
Subparts D, E, F, G, H, P, Q - APM Application Modified 1471 1471 213295 Other-Screen Shots
Other-PRA Statement in eWell
Form and Instruction BSEE Form-0124
Subparts D, E, F, G, H, P, Q - Revised APM Application Modified 2235 2235 0
Total burden requested under this ICR: 12391 31472 5483295  