View Information Collection (IC) List View Supporting Statement and Other Documents
Blank fields in records indicate information that was not collected or not collected electronically prior to July 2006.


View ICR - OIRA Conclusion



1218-0226 200206-1218-001
Historical Active 200003-1218-012
DOL/OSHA
Standard on Manlifts (29 CFR 1910.68(e)(3))
Extension without change of a currently approved collection   No
Regular
Approved without change 08/06/2002
Retrieve Notice of Action (NOA) 06/26/2002
Approved for two years. Prior to the next approval, OSHA will demonstrate the practical utility of this collection by 1) detailing how the 30-day periodic inspection requirement has been used by the agency, and 2) presenting to OMB an analysis of the impact of altering this requirement to 45, 60, or 90 days. OSHA should also report on whether their inspection requirement is more or less stringent than that of the manlift manufacturer.
  Inventory as of this Action Requested Previously Approved
08/31/2004 08/31/2004 08/31/2002
36,000 0 156,000
41,400 0 51,000
0 0 0