View Information Collection Request (ICR) Package
Skip to main content
An official website of the United States government
The .gov means it's official.
Federal government websites often end in .gov or .mil. Before sharing sensitive information, make sure you're on a federal government site.
The site is secure.
The https:// ensures that you are connecting to the official website and that any information you provide is encrypted and transmitted securely.
Search:
Agenda
Reg Review
ICR
This script is used to control the display of information in this page.
Display additional information by clicking on the following:
All
Brief and OIRA conclusion
Abstract/Justification
Legal Statutes
Rulemaking
FR Notices/Comments
IC List
Burden
Misc.
Common Form Info.
Certification
View Information Collection (IC) List
View Supporting Statement and Other Documents
Please note that the OMB number and expiration date may not have been determined when this Information Collection Request and associated Information Collection forms were submitted to OMB. The approved OMB number and expiration date may be found by clicking on the Notice of Action link below.
View ICR - OIRA Conclusion
OMB Control No:
1902-0264
ICR Reference No:
201505-1902-004
Status:
Historical Inactive
Previous ICR Reference No:
201310-1902-001
Agency/Subagency:
FERC
Agency Tracking No:
FERC-725N
Title:
FERC-725N, (NOPR in RM-15-11) Mandatory Reliability Standard for Transmission System Planned Performance for Geomagnetic Disturbance Events
Type of Information Collection:
Revision of a currently approved collection
Common Form ICR:
No
Type of Review Request:
Regular
OIRA Conclusion Action:
Comment filed on proposed rule and continue
Conclusion Date:
09/29/2015
Retrieve Notice of Action (NOA)
Date Received in OIRA:
06/09/2015
Terms of Clearance:
Pursuant to 5 CFR 1320.11(c), OMB files this comment on this information collection request (ICR). In accordance with 5 CFR 1320, OMB is withholding approval at this time. The agency shall examine public comment in response to the proposed rulemaking and will include in the supporting statement of the next ICR--to be submitted to OMB at the final rule stage--a description of how the agency has responded to any public comments on the ICR, including comments on maximizing the practical utility of the collection and minimizing the burden.
Inventory as of this Action
Requested
Previously Approved
Expiration Date
01/31/2017
36 Months From Approved
01/31/2017
Responses
183
0
183
Time Burden (Hours)
15,471
0
15,471
Cost Burden (Dollars)
0
0
0
Abstract:
The Federal Energy Regulatory Commission (Commission) proposes to approve Reliability Standard TPL-007-1 (Transmission System Planned Performance for Geomagnetic Disturbance Events). Proposed Reliability Standard TPL-007-1 establishes requirements for certain entities to assess the vulnerability of their transmission systems to geomagnetic disturbance events (GMDs), which occur when the sun ejects charged particles that interact and cause changes in the earth's magnetic fields. Entities that do not meet certain performance requirements, based on the results of their vulnerability assessments, must develop a plan to achieve the requirements.
Authorizing Statute(s):
US Code:
16 USC 824o
Name of Law: Energy Policy Act of 2005
Citations for New Statutory Requirements:
None
Associated Rulemaking Information
RIN:
Stage of Rulemaking:
Federal Register Citation:
Date:
1902-AF04
Proposed rulemaking
Federal Register Notices & Comments
Did the Agency receive public comments on this ICR?
No
Number of Information Collection (IC) in this ICR:
1
IC Title
Form No.
Form Name
Mandatory Reliability Standard for Transmission System Planned Performance
Burden increases because of Program Change due to Agency Discretion:
Yes
Burden Increase Due to:
Miscellaneous Actions
Burden decreases because of Program Change due to Agency Discretion:
No
Burden Reduction Due to:
Short Statement:
The Commission proposes to approve Reliability Standard TPL-007-1 and the associated implementation plan, violation severity levels, and violation risk factors, as discussed above. Proposed Reliability Standard TPL-007-1 will impose new requirements for transmission planners, planning coordinators, transmission owners, and generator owners. 1. Proposed Reliability Standard TPL-007-1, Requirement R1 requires planning coordinators, in conjunction with transmission planner, to identify the responsibilities of the planning coordinator and transmission planner in the planning coordinator's planning area for maintaining models and performing the study or studies needed to complete GMD Vulnerability Assessments. 2. Proposed Requirements R2, R3, R4, R5, and R7 refer to the "responsible entity, as determined by Requirement R1," when identifying which applicable planning coordinators or transmission planners are responsible for maintaining models and performing the necessary study or studies. 3. Proposed Requirement R2 requires that the responsible entities maintain models for performing the studies needed to complete GMD Vulnerability Assessments, as required in proposed Requirement R4. 4. Proposed Requirement R3 requires responsible entities to have criteria for acceptable system steady state voltage performance during a benchmark GMD event. 5. Proposed Requirement R4 requires responsible entities to complete a GMD Vulnerability Assessment of the near-term transmission planning horizon once every 60 calendar months. 6. Proposed Requirement R5 requires responsible entities to provide GIC flow information to transmission owners and generator owners that own an applicable bulk electric system power transformer in the planning area. This information is necessary for applicable transmission owners and generator owners to conduct the thermal impact assessments required by proposed Requirement R6. 7. Proposed Requirement R6 requires applicable transmission owners and generator owners to conduct thermal impact assessments where the maximum effective GIC value provided in proposed Requirement R5, Part 5.1 is 75 A/phase or greater. 8. Proposed Requirement R7 requires responsible entities to develop a corrective action plan when its GMD Vulnerability Assessment indicates that its system does not meet the performance requirements of Table 1 – Steady State Planning Events. The corrective action plan must address how the performance requirements will be met, must list the specific deficiencies and associated actions that are necessary to achieve performance, and must set forth a timetable for completion.
Annual Cost to Federal Government:
$5,193
Does this IC contain surveys, censuses, or employ statistical methods?
No
Is the Supporting Statement intended to be a Privacy Impact Assessment required by the E-Government Act of 2002?
No
Is this ICR related to the Affordable Care Act [Pub. L. 111-148 & 111-152]?
No
Is this ICR related to the Dodd-Frank Wall Street Reform and Consumer Protection Act, [Pub. L. 111-203]?
No
Is this ICR related to the American Recovery and Reinvestment Act of 2009 (ARRA)?
No
Is this ICR related to the Pandemic Response?
Uncollected
Agency Contact:
David O'Conner 202 502-6695
Common Form ICR:
No
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(a) It is necessary for the proper performance of agency functions;
(b) It avoids unnecessary duplication;
(c) It reduces burden on small entities;
(d) It uses plain, coherent, and unambiguous language that is understandable to respondents;
(e) Its implementation will be consistent and compatible with current reporting and recordkeeping practices;
(f) It indicates the retention periods for recordkeeping requirements;
(g) It informs respondents of the information called for under 5 CFR 1320.8 (b)(3) about:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
(h) It was developed by an office that has planned and allocated resources for the efficient and effective management and use of the information to be collected.
(i) It uses effective and efficient statistical survey methodology (if applicable); and
(j) It makes appropriate use of information technology.
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
Certification Date:
06/09/2015