View Information Collection Request (ICR) Package
Skip to main content
An official website of the United States government
The .gov means it's official.
Federal government websites often end in .gov or .mil. Before sharing sensitive information, make sure you're on a federal government site.
The site is secure.
The https:// ensures that you are connecting to the official website and that any information you provide is encrypted and transmitted securely.
Search:
Agenda
Reg Review
ICR
This script is used to control the display of information in this page.
Display additional information by clicking on the following:
All
Brief and OIRA conclusion
Abstract/Justification
Legal Statutes
Rulemaking
FR Notices/Comments
IC List
Burden
Misc.
Common Form Info.
Certification
View Information Collection (IC) List
View Supporting Statement and Other Documents
Please note that the OMB number and expiration date may not have been determined when this Information Collection Request and associated Information Collection forms were submitted to OMB. The approved OMB number and expiration date may be found by clicking on the Notice of Action link below.
View ICR - OIRA Conclusion
OMB Control No:
1902-0264
ICR Reference No:
202004-1902-007
Status:
Historical Active
Previous ICR Reference No:
201912-1902-002
Agency/Subagency:
FERC
Agency Tracking No:
FERC-725N
Title:
FERC-725N, (RD20-3-000) Mandatory Reliability Standards: TPL Reliability Standards
Type of Information Collection:
Revision of a currently approved collection
Common Form ICR:
No
Type of Review Request:
Regular
OIRA Conclusion Action:
Approved with change
Conclusion Date:
10/28/2020
Retrieve Notice of Action (NOA)
Date Received in OIRA:
07/14/2020
Terms of Clearance:
In accordance with 5 CFR 1320, the information collection is approved. Because FERC did not seek comment on the overall paperwork collection associated with OMB Control No. 1902-0264, this information collection is approved through the current expiration date. Note that FERC included a one-time burden estimate (7,704 hours) associated with the addition of Reliability Standard TPL-001-5 in this collection that was annualized over the three year approval period. FERC will need to remove this burden from this collection and their inventory after year 3, which will end in 3/2022. Additionally, FERC will need to address the previous terms of clearance when Reliability Standards TPL-001-0 through TPL-001-004 are revised in the future: "When FERC considers approval of the next versions of Reliability Standards TPL-001 through TPL-004, and TPL-007, they should consider small entity impacts and potential options for reducing their recordkeeping and reporting burden."
Inventory as of this Action
Requested
Previously Approved
Expiration Date
03/31/2023
03/31/2023
03/31/2023
Responses
3,784
0
2,105
Time Burden (Hours)
113,244
0
46,084
Cost Burden (Dollars)
0
0
0
Abstract:
RD20-3-000: Reliability Standard TPL-007-4 requires owners and operators of the Bulk-Power System (BPS) to conduct initial and on-going vulnerability assessments of the potential impact of defined geomagnetic disturbance (GMD) events on BPS equipment and the BPS as a whole. The modifications in the proposed standard address the Commission’s directives in Order No. 851 related to requirements for Corrective Action Plans. Final Rule in Docket RM19-10. Pursuant to section 215(d)(2) of the Federal Power Act (FPA), the Commission approves Reliability Standard TPL-001-5 (Transmission System Planning Performance Requirements). The North American Electric Reliability Corporation (NERC), the Commission-certified Electric Reliability Organization (ERO), submitted Reliability Standard TPL-001-5 for Commission approval in response to directives in Order No. 786. As discussed in this final rule, we determine that Reliability Standard TPL-001-5 improves upon currently-effective Reliability Standard TPL-001-4 by addressing: (1) the study of single points of failure of protection systems; and (2) planned maintenance outages and stability analysis for spare equipment strategies. The improvements in Reliability Standard TPL-001-5 are responsive to the directives in Order No. 786 regarding planned maintenance outages and stability analysis for spare equipment strategies. Reliability Standard TPL-001-5 is responsive in that it requires each planning coordinator and transmission planner to perform an annual planning assessment of its portion of the bulk electric system considering a number of system conditions and contingencies with a risk-based approach. The improvements in Reliability Standard TPL-001-5 are also responsive to the concerns identified in Order No. 754 regarding the study of a single point of failure on protection systems. Reliability Standard TPL-001-5 contains revisions to the planning events (Category P5) and extreme events (Stability 2.a-h) identified in Table 1 (Steady State and Stability Performance Planning Events and Steady State and Stability Performance Extreme Events), as well as the associated footnote 13, to provide for a more comprehensive study of the potential impacts of protection system single points of failure. For more common scenarios (i.e., planning events), the planning entity must develop a corrective action plan if it determines through studies that its system would experience performance issues. For less common scenarios that could result in potentially severe impacts such as cascading (i.e., extreme events), the planning entity must conduct a comprehensive analysis to understand both the potential impacts on its system and the types of actions that could reduce or mitigate those impacts. Reliability Standard TPL-001-5 is also responsive to Order No. 786 by modifying the requirements for stability analysis to require an entity to assess the impact of the possible unavailability of long lead time equipment, consistent with the entity’s spare equipment strategy. Accordingly, pursuant to section 215(d)(2) of the FPA, the Commission approves Reliability Standard TPL-001-5 as just, reasonable, not unduly discriminatory or preferential, and in the public interest.
Authorizing Statute(s):
US Code:
16 USC 824o
Name of Law: Energy Policy Act of 2005
Citations for New Statutory Requirements:
None
Associated Rulemaking Information
RIN:
Stage of Rulemaking:
Federal Register Citation:
Date:
Not associated with rulemaking
Federal Register Notices & Comments
60-day Notice:
Federal Register Citation:
Citation Date:
85 FR 21222
04/16/2020
30-day Notice:
Federal Register Citation:
Citation Date:
85 FR 40637
07/07/2020
Did the Agency receive public comments on this ICR?
No
Number of Information Collection (IC) in this ICR:
6
IC Title
Form No.
Form Name
Burden from RM12-11/RM13-9 Final Rule (one-time and ongoing)
RD20-3-000, Mandatory Reliability TPL Standards: TPL-007-4
RM19-10, TPL-001-5, averaged over Years 1-3
TPL-007-2 [formerly-1] Reliability Standard (R1-R6, On-going, in Final Rule in RM18-8 [& formerly in Final Rule in RM15-11])
TPL-007-2, Requirement 10 (Final Rule in RM18-8)
TPL-007-2, Requirements 7, 8,9,11, &12 (Final Rule in RM18-8)
ICR Summary of Burden
Total Approved
Previously Approved
Change Due to New Statute
Change Due to Agency Discretion
Change Due to Adjustment in Estimate
Change Due to Potential Violation of the PRA
Annual Number of Responses
3,784
2,105
0
1,679
0
0
Annual Time Burden (Hours)
113,244
46,084
0
67,160
0
0
Annual Cost Burden (Dollars)
0
0
0
0
0
0
Burden increases because of Program Change due to Agency Discretion:
Yes
Burden Increase Due to:
Miscellaneous Actions
Burden decreases because of Program Change due to Agency Discretion:
No
Burden Reduction Due to:
Short Statement:
In the Delegated Order RD20-3-000, the Commission approved Reliability Standard TPL-007-04. The Commission estimates an increase in burden to TPL-007-04 to be ongoing for this standard only. This increase will only affect Reliability Standard TPL-007-4 which requires owners and operators of the Bulk-Power System (BPS) to conduct initial and on-going vulnerability assessments of the potential impact of defined geomagnetic disturbance (GMD) events on BPS equipment and the BPS as a whole.
Annual Cost to Federal Government:
$4,832
Does this IC contain surveys, censuses, or employ statistical methods?
No
Does this ICR request any personally identifiable information (see
OMB Circular No. A-130
for an explanation of this term)? Please consult with your agency's privacy program when making this determination.
No
Does this ICR include a form that requires a Privacy Act Statement (see
5 U.S.C. §552a(e)(3)
)? Please consult with your agency's privacy program when making this determination.
No
Is this ICR related to the Affordable Care Act [Pub. L. 111-148 & 111-152]?
No
Is this ICR related to the Dodd-Frank Wall Street Reform and Consumer Protection Act, [Pub. L. 111-203]?
No
Is this ICR related to the American Recovery and Reinvestment Act of 2009 (ARRA)?
No
Is this ICR related to the Pandemic Response?
No
Agency Contact:
Michael Gandolfo 202 502-6817
Common Form ICR:
No
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(a) It is necessary for the proper performance of agency functions;
(b) It avoids unnecessary duplication;
(c) It reduces burden on small entities;
(d) It uses plain, coherent, and unambiguous language that is understandable to respondents;
(e) Its implementation will be consistent and compatible with current reporting and recordkeeping practices;
(f) It indicates the retention periods for recordkeeping requirements;
(g) It informs respondents of the information called for under 5 CFR 1320.8 (b)(3) about:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
(h) It was developed by an office that has planned and allocated resources for the efficient and effective management and use of the information to be collected.
(i) It uses effective and efficient statistical survey methodology (if applicable); and
(j) It makes appropriate use of information technology.
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
Certification Date:
07/14/2020