Title: Policy and Procedures for Processing Requests to Alter US Army Corps of Engineers Civil Works Projects Pursuant to 33 U.S.C. 408 
Abstract:

Where a party other than the US Army Corps of Engineers (Corps) seeks to use or alter a Civil Works project that the Corps constructed, the proposed use or alteration is subject to the prior approval of the Corps. Some examples of such alterations by a party other than the Corps include an improvement to the project; relocation of part of the project; the introduction of hydropower generation at a Corps dam; and installing utilities or other non-project features. This requirement was established in section 14 of the Rivers and Harbors Act of 1899 and is codified at 33 U.S.C. 408 (section 408). Section 408 provides that the Corps may grant permission for another party to alter a Civil Works project upon a determination that the alteration proposed will not be injurious to the public interest and will not impair the usefulness of the Civil Works project. The Corps is proposing to replace its current guidance with a regulation.  T he program is now covered by Corps policy, last issued in September 2018 (Corps' Engineer Circular 1165-2-220, Policy and Procedural Guidance for Processing Requests to Alter US Army Corps Works Projects).

The Corps conducted six virtual listening sessions in the summer of 2022 to solicit feedback on the Section 408 program.  The feedback was helpful to understanding the challenges, best practices, and future opportunities with the Section 408 program, and will inform the development of a proposed rule.  Additional sessions would be conducted following publication of the proposed rule.

 

 

 
Agency: Department of War(DOW)  Priority: Other Significant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Proposed Rule Stage 
Major: No  Unfunded Mandates: No 
EO 14192 Designation: Deregulatory 
CFR Citation: 33 CFR 350   
Legal Authority: 33 U.S.C. 408   
Legal Deadline:  None
Timetable:
Action Date FR Cite
NPRM  07/00/2026 
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Small Entities Affected: No  Federalism: No 
Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
Elliott Carman
Department of War
108 Army Pentagon, Room 3E419,
Washington, DC 20310-0108
Phone:703 300-2899
Email: elliott.n.carman.civ@army.mil

Bonnie Jennings
Department of War
U.S. Army Corps of Engineers
Washington, DC 20314
Phone:502 552-7204
Email: bonnie.f.jennings@usace.army.mil