View Rule
| View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
| DOL/OSHA | RIN: 1218-AC81 | Publication ID: Spring 2025 |
| Title: Amendments to the Cranes and Derricks in Construction Standard | |
|
Abstract:
The Occupational Safety and Health Administration (OSHA) is proposing corrections and amendments to the final standard for cranes and derricks published in August 2010. These revisions are deregulatory and reduce burdens on the regulated community by reducing the scope of applicability of some requirements, potentially eliminating some requirements, and making the standard clearer and easier to understand. The standard has many provisions designed to improve crane safety and reduce worker injuries and fatalities. The proposed amendments: correct references to power line voltage for direct current (DC) voltages and alternating current (AC) voltages, narrow the scope for forklifts carrying loads under the forks to cover forklifts fitted with a "winch and boom" (scope will exclude forklifts fitted only with a "winch or hook"), clarify an exclusion for work activities when using articulating cranes, provide four definitions inadvertently omitted in the final standard, replace "minimum approach distance" with "minimum clearance distance" throughout to remove ambiguity, clarify the use of demarcated boundaries for work near power lines, correct an error permitting body belts to be used as a personal fall arrest system rather than a personal fall restraint system, replace the verb "must" with "may" used in error in several provisions, correct an error in a caption on standard hand signals, and resolve an issue of "NRTL-approved" safety equipment (e.g., proximity alarms and insulating devices) that is required by the final standard, but are not yet available. |
|
| Agency: Department of Labor(DOL) | Priority: Other Significant |
| RIN Status: Previously published in the Unified Agenda | Agenda Stage of Rulemaking: Long-Term Actions |
| Major: Undetermined | Unfunded Mandates: No |
| EO 14192 Designation: Deregulatory | |
| CFR Citation: 29 CFR 1926 | |
| Legal Authority: 29 U.S.C. 655(b) | |
|
Legal Deadline:
None |
||||||
Timetable:
|
| Regulatory Flexibility Analysis Required: No | Government Levels Affected: None |
| Small Entities Affected: Businesses | Federalism: No |
| Included in the Regulatory Plan: No | |
| RIN Data Printed in the FR: No | |
|
Agency Contact: Brian Rizzzo Acting Director, Directorate of Construction Department of Labor Occupational Safety and Health Administration Room N-3468, 200 Constitution Avenue NW, Washington, DC 20210 Phone:202 693-2495 Email: rizzo.brian.a@dol.gov |
|