View Rule

View EO 12866 Meetings Printer-Friendly Version     Download RIN Data in XML

FERC RIN: 1902-AD71 Publication ID: Fall 2010 
Title: Version Two Facilities Design, Connections and Maintenance Reliability Standards 
Abstract: The Commission approves under section 215 of the Federal Power Act, three revised Reliability Standards developed and designated by the North American Electric Reliability Corporation, as FAC-010-2, FAC-011-2 and FAC-014-2, to set requirements for the development and communication of system operating limits of the Bulk Power System for use in the planning and operation horizons. The Commission also approves, with modifications, the violation severity levels for the three Reliability Standards. (Docket No. RM08-11-000). 
Agency: Federal Energy Regulatory Commission(FERC)  Priority: Substantive, Nonsignificant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Final Rule Stage 
Major: No  Unfunded Mandates: No 
CFR Citation: 18 CFR 40   
Legal Authority: 16 USC 824o   
Legal Deadline:  None
Timetable:
Action Date FR Cite
NPRM  10/23/2008  73 FR 63105   
NPRM Comment Period End  11/24/2008    
Final Rule  03/30/2009  74 FR 14008   
Order on Rehearing  12/00/2010    
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Small Entities Affected: No  Federalism: No 
Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
Cory Lankford
Legal Information, Office of the General Counsel
Federal Energy Regulatory Commission
888 First Street NE,
Washington, DC 20426
Phone:202 502-6711
Email: cory.lankford@ferc.gov